WELL · 42-353-32689 · DISTRICT 7
Pace 6701 #6701
Nolan County · Sprague (Flippen) field · Vertical
Pace 6701 #6701 (API 42-353-32689) is a plugged well in Nolan County, plugged February 23, 2006, last operated by Walter Exploration Company.
The RRC has issued one drilling permit, issued June 1, 2000, permitted to 4,000 ft.
It was permitted by Walter Exploration Inc. and has since transferred to Walter Exploration Company on the wellbore schedule.
Completion filings report 2 formation tops, including Coleman Junction, Noodle Creek.
Its lease has reported 6.23K barrels of oil and 525 mcf of gas since September 2000, last reporting in March 2006.
Operator of record
Permitted by Walter Exploration Inc.; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Jul 4, 2026 · 111 permits on file · (214) 288-8080
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Walter Exploration Company |
| Production reports | Walter Exploration Companythrough Jul 2003 |
| Latest permit | Walter Exploration Inc.Jun 1, 2000 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,000
- total depth, ft
- 1
- permits on file
- Jun 1, 2000
- last permit issued
- Aug 22, 2000
- completed
- 6.23K
- cumulative oil, bbl
- 525
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2000 THROUGH Mar 2006
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 22, 2000
- Shut in
- —
- Plugged
- Feb 23, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Pace 6701 O-8-28875 | Sprague (Flippen) | Walter Exploration Company | 1 | 6.23K | 525 | Sep 2000 – Mar 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Walter Exploration Inc.Sep 2000 → Sep 2001
- 2Walter Exploration CompanyOct 2001 → Jul 2003
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 495617-99 | Drill | Walter Exploration Inc. | May 30, 2000 | Jun 1, 2000 | Aug 12, 2000 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-28875 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,470 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman Junction | 2,450 | 20 |
| Noodle Creek | 3,430 | -960 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,634 | 3,642 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 270 | 12.25 | 215 S |
| 4.5 | 3,980 | 7.875 | 606 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 28, 2000 | Oct 11, 2000 | Yes |
| 00 | Oct 20, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-353-32689 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-353-32689 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35332689, documented in the API reference.