WELL · 42-353-32923 · DISTRICT 7
Rojean -A- #2
Nolan County · White Flat (Noodle Creek) field · Vertical
Rojean -A- #2 (API 42-353-32923) is a plugged well in Nolan County, plugged April 5, 2018, last operated by Mid-Con Energy Operating LLC.
The RRC has issued one drilling permit, issued November 17, 2006, permitted to 2,999 ft.
It was permitted by Telesis Operating CO., Inc. and has since transferred to Mid-Con Energy Operating LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Coleman Junction, Sedwick, Noodle Creek.
Operator of record
Permitted by Telesis Operating Co., Inc.; the EWA schedule now lists a different operator.
Tulsa, OK · P-5 Inactive, filed Mar 28, 2019 · 79 permits on file · (918) 743-7575
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mid-Con Energy Operating LLC |
| Production reports | none |
| Latest permit | Telesis Operating Co., Inc.Nov 17, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,999
- total depth, ft
- 1
- permits on file
- Nov 17, 2006
- last permit issued
- Dec 22, 2006
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2007 THROUGH Jun 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 22, 2006
- Shut in
- —
- Plugged
- Apr 5, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Rojean -A- O-8-29855 | White Flat (Noodle Creek) | Mid-Con Energy Operating, LLC | 1 | 0 | 0 | Jan 2007 – Jun 2018 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 629150-99 | Drill | Telesis Operating Co., Inc. | Nov 16, 2006 | Nov 17, 2006 | Nov 29, 2006 | 2,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-29855 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,972 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman Junction | 2,140 | -168 |
| Sedwick | 2,446 | -474 |
| Noodle Creek | 2,768 | -796 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,791 | 2,800 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 218 | 12.25 | 120 S |
| 4.5 | 2,838 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 2, 2008 | Sep 26, 2007 | — |
| 00 | May 2, 2007 | Jan 25, 2007 | Yes |
| 00 | Feb 14, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-353-32923 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-353-32923 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 59.8K
- bbl, all reported
- Nov 2018
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000097432 | H-1 Injection | Plugged Apr 30, 2018 | 500 | 1,395 | 2,791–2,800 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35332923, documented in the API reference.