WELL · 42-353-33512 · DISTRICT 7

Pritchard #8

N

Nolan County · Divide (Flippen) field  · Vertical

Pritchard #8 (API 42-353-33512) is a well in Nolan County operated by Cinnabar Energy Ltd., completed September 14, 2015.

The RRC has issued 2 drilling permits (amended once) between 2014 and 2015, permitted to 5,999 ft.

Completion filings report 10 formation tops, including Coleman Junction, Noodle Creek - Disposal, Flippen Lime - Disposal, Breckenridge - Disposal.

Its 2 leases have reported 60.3K barrels of oil and 31K mcf of gas since February 2013, last reporting in July 2026. The leases carry 8 wells, so these are lease totals, not this well alone.

Operator of record

Cinnabar Energy Ltd.

Fort Worth, TX · P-5 Y, filed Dec 6, 2019 · 17 permits on file · (817) 366-8426

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCinnabar Energy Ltd.
Production reportsDJ & T Services, LLCthrough Feb 2026
Latest permitCinnabar Energy, Ltd.Oct 6, 2015

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,999
total depth, ft
3
permits on file
Oct 6, 2015
last permit issued
Sep 14, 2015
completed
60.3K
cumulative oil, bbl
31K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 14, 2015
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pritchard O-8-31174Hat Top Mountain, N. (Cook Lime)DJ & T Services, LLC760.3K31KFeb 2013 – Jul 2026
Pritchard O-8-31866Divide (Flippen)Cinnabar Energy, Ltd.1640Sep 2015 – Oct 2015

Oil, barrels lease total

Last 12 months 383 · prior 12 811(-53%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Double M Petroproperties, Inc.Mar 2013 → Jul 2025
  2. 2Cinnabar Energy, Ltd.Jun 2013 → May 2018
  3. 3DJ & T Services, LLCAug 2025 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
810850-99Field transferCinnabar Energy, Ltd.Oct 1, 2015Oct 6, 2015Jul 28, 20155,999
787216-98DrillCinnabar Energy, Ltd.Apr 11, 2015Jun 27, 2014Jul 28, 20155,999
787216-99DrillCinnabar Energy, Ltd.May 15, 2014Jun 27, 2014—3,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-31174————
—— O-8-31866————

Formation tops

As filed on W-2/G-1. Subsea from 2,298 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman JunctionCOLEMAN JUNCTION - CORROSIVE; PO2,110188
Noodle Creek - Disposal2,525-227
Flippen Lime - Disposal3,342-1,044
Breckenridge - Disposal——
Elm Creek - Disposal——
Flippen Sand - Disposal——
King Sand - Disposal——
TannehillTANNEHILL - DISPOSAL——
Wichita-AlbanyWICHITA ALBANY - DISPOSAL——
WolfcampWOLFCAMP - DISPOSAL——

Perforations

Perforated and open-hole intervals.

FromToType
3,3963,404Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
12.254228.625280 S
8.62542212.25280 S
7.8753,5704.5430 S
4.53,5707.875430 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 23, 2015Oct 7, 2015Yes
00Sep 24, 2015Sep 21, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35333512, documented in the API reference.