WELL · 42-353-33627 · DISTRICT 8

Tema Little #7WI

N

Nolan County  · Vertical

Tema Little #7WI (API 42-353-33627) is a former disposal or injection well in Nolan County, last operated by Mid-Con Energy Operating, LLC; its UIC permit is no longer active.

The RRC has issued one drilling permit, issued March 17, 2017, permitted to 5,500 ft.

Operator of record

Mid-Con Energy Operating, LLC

Tulsa, OK · P-5 Y, filed Jan 3, 2020 · 79 permits on file · (918) 743-7575

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitMid-Con Energy Operating, LLCMar 17, 2017
5,500
total depth, ft
1
permits on file
Mar 17, 2017
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
824131-99DrillMid-Con Energy Operating, LLCMar 6, 2017Mar 17, 2017—5,500

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Nov 2020
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000115217H-1 InjectionCanceled Jan 11, 20211,0002,5005,000–5,180

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120192020

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35333627, documented in the API reference.