WELL · 42-355-30022 · DISTRICT 4

Corpus Christi, E (Frio 1ST)UNIT #1

N

Nueces County  · Directional

Corpus Christi, E (Frio 1st)Unit #1 (API 42-355-30022) is a permitted well in Nueces County filed by Sabco Operating Company; no completion report is on file yet.

The RRC has issued 4 drilling permits between 1977 and 2006, permitted to 9,874 ft.

Completion filings report 2 formation tops, including Wildcat, H3.

Its 4 leases have reported 44.6K barrels of oil and 3.32M mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Sabco Operating Company

Houston, TX · P-5 Y, filed Dec 6, 2013 · 153 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsSabco Operating Company, LLCthrough Nov 2013
Latest permitSabco Operating CompanyOct 30, 2006
9,874
total depth, ft
4
permits on file
Oct 30, 2006
last permit issued
—
completed
44.6K
cumulative oil, bbl
3.32M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
TSL 33099/TR 54/ G-4-249116Corpus Christi, E. (FB-5, H2)White Marlin Operating Co, LLC1036.4KMar 2009 – Jul 2026
TSL 33099/TR 54/ O-4-13027Corpus Christi, E. (FB-5, H2)Sabco Operating Company144.6K1.48MMay 2001 – Jul 2009
TSL 33099 /TR 54/ G-4-141423Corpus Christi, E. (D-6)Sabco Operating Company101.8MJan 1993 – Apr 2001
— G-4-81651——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Merrico Resources, Inc.Jan 1993 → Mar 1995
  2. 2Sabco Oil and Gas CorporationApr 1995 → Dec 1996
  3. 3Sabco Operating CompanyJan 1997 → Oct 2011
  4. 4Sabco Operating Company, LLCNov 2011 → Nov 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
627363-99RecompletionSabco Operating CompanyOct 11, 2006Oct 30, 2006—9,874
508545-99RecompletionSabco Operating CompanyMay 4, 2001May 4, 2001Mar 19, 20017,889
396513-99RecompletionMerrico Resources, Inc.Feb 7, 1992Feb 26, 1992Jul 29, 19918,600
5499-99DrillGulf Oil Corp.Aug 16, 1977Aug 16, 1977Jul 16, 19789,874

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-81651————
—— G-4-141423————
—— G-4-249116————
—— O-4-13027————

Formation tops

As filed on W-2/G-1. Subsea from 24 ft elevation.Download CSV →

FormationMD ftSubsea
Wildcat7,588-7,564
H38,642-8,618

Perforations

Perforated and open-hole intervals.

FromToType
7,5887,592Perforated
7,6027,608Perforated
7,8637,869Perforated
8,5578,565Perforated
8,6428,650Perforated
8,6628,668Perforated
8,6688,674Perforated
8,7748,780Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,04717.251,200 S
13.3752,04717.51,200 S
2.3758,457——
9.6259,44312.25850 S
5.59,8638.51,050 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 24, 2009Jul 7, 2009Yes
00Jul 10, 2009——
00Aug 8, 2001May 9, 2001—
00Jun 20, 2001——
00Jul 9, 1992Mar 11, 1992Yes
00Jun 5, 1992——
00Apr 23, 1985Dec 19, 1984—
00Jan 12, 1984Mar 1, 1979—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35530022, documented in the API reference.