WELL · 42-355-30064 · DISTRICT 4
Chapman, J. O. #42
Nueces County · Vertical
Chapman, J. O. #42 (API 42-355-30064) is a permitted well in Nueces County filed by Shana Petroleum Company; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1997 and 2001, permitted to 4,360 ft.
Its 2 leases have reported 10.3K barrels of oil and 55.3K mcf of gas since January 1993, last reporting in October 2006. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Dallas, TX · P-5 Y, filed May 3, 2002 · 208 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Shana Petroleum Companythrough Feb 2000 |
| Latest permit | Shana Petroleum CompanyMay 17, 2001 |
- 4,360
- total depth, ft
- 2
- permits on file
- May 17, 2001
- last permit issued
- —
- completed
- 10.3K
- cumulative oil, bbl
- 55.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2006
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Chapman, J. O. O-4-7598 | Chapman Ranch (C- 5) | Decker Operating Co., L.L.C. | 2 | 10.3K | 4.32K | Jan 1993 – Oct 2006 |
| Chapman, J. O. G-4-165010 | Chapman Ranch (L-24) | Neg Operating LLC | 1 | 0 | 51K | Aug 1997 – Nov 2002 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texaco E & P Inc.Jan 1993 → Jul 1994
- 2Royal Production Company, Inc.Aug 1994 → Mar 1996
- 3Shell Western E&P Inc.Aug 1997 → Aug 1999
- 4Shana Petroleum CompanySep 1999 → Feb 2000
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 508976-99 | Recompletion | Shana Petroleum Company | May 14, 2001 | May 17, 2001 | — | 4,360 |
| 462390-99 | Recompletion | Shell Western E&P Inc. | May 14, 1997 | May 14, 1997 | Aug 19, 1997 | 4,360 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-165010 | — | — | — | — |
| — | — O-4-7598 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,162 | 3,167 | Perforated |
| 4,247 | 4,254 | Perforated |
| — | 4,254 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,400 | 12.25 | 480 S |
| 9.625 | 1,487 | 12.25 | 480 S |
| 4.5 | 4,359 | 7.875 | 400 S |
| 10.5 | — | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 3, 1997 | Oct 8, 1997 | Yes |
| 00 | Nov 3, 1997 | — | — |
| 00 | Mar 17, 1992 | Feb 12, 1992 | — |
| 00 | Jan 12, 1984 | Mar 12, 1970 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-355-30064 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-355-30064 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35530064, documented in the API reference.