WELL · 42-355-30209 · DISTRICT 4
Blacknall Sally #1
Nueces County · Clara Driscoll (5500 Sd.) field · Vertical
Blacknall Sally #1 (API 42-355-30209) is a plugged well in Nueces County, plugged November 8, 2007, last operated by Rhodes & Hicks Drlg. Corp..
The RRC has issued one drilling permit, issued July 7, 1986, permitted to 5,413 ft.
It was permitted by Western Gulf Oil & Gas Inc. and has since transferred to Rhodes & Hicks Drlg. Corp. on the wellbore schedule.
Completion filings report 3 formation tops, including Oakville, Catahoula, Frio.
Operator of record
Permitted by Western Gulf Oil & Gas Inc.; the EWA schedule now lists a different operator.
Alice, TX · P-5 Y, filed Jul 15, 1982 · 5 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rhodes & Hicks Drlg. Corp. |
| Production reports | none |
| Latest permit | Western Gulf Oil & Gas Inc.Jul 7, 1986 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,413
- total depth, ft
- 1
- permits on file
- Jul 7, 1986
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Nov 8, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Blacknall, Sally O-4-11143 | Clara Driscoll | Western Gulf Oil & Gas, LLC | 1 | 0 | 0 | Jan 1993 – Aug 2008 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 303864-99 | Other | Western Gulf Oil & Gas Inc. | Jul 3, 1986 | Jul 7, 1986 | — | 5,413 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-4-11143 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 53 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,659 | 3,705 | Perforated |
| — | 5,258 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 510 | 12.25 | 260 S |
| 4.5 | 5,396 | 7.875 | 800 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 23, 1986 | Dec 1, 1986 | — |
| 00 | Dec 5, 1986 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-355-30209 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-355-30209 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 256K
- bbl, all reported
- Feb 2008
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000062095 | H-1 Injection | Plugged May 2, 2008 | 1,000 | 1,000 | 3,660–3,710 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35530209, documented in the API reference.