WELL · 42-355-30407 · DISTRICT 4

Chapman, J. O. #54

N

Nueces County  · Vertical

Chapman, J. O. #54 (API 42-355-30407) is a former disposal or injection well in Nueces County, last operated by Shana Petroleum Company; its UIC permit is no longer active.

The RRC has issued 5 drilling permits (amended once) between 1977 and 2002, permitted to 7,700 ft.

Its 3 leases have reported 221 barrels of oil and 20.6K mcf of gas since January 1993, last reporting in January 2003. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

Shana Petroleum Company

Dallas, TX · P-5 Y, filed May 3, 2002 · 208 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsShana Petroleum Companythrough Nov 2001
Latest permitShana Petroleum CompanyMar 8, 2002
7,700
total depth, ft
6
permits on file
Mar 8, 2002
last permit issued
—
completed
221
cumulative oil, bbl
20.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Chapman, J. O. O-4-10106Chapman Ranch (3700)Neg Operating LLC3221910Jan 1993 – Jan 2003
Chapman, J. O. G-4-177668Chapman Ranch (L-20-3)Neg Operating LLC1019.7KJun 2000 – Jun 2002
Chapman,j. O. G-4-78605Chapman Ranch (O-18)Shana Petroleum Company100Jan 1993 – Nov 1999

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Apr 1993
  2. 2Shana Petroleum CompanyJun 2000 → Nov 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
518163-99RecompletionShana Petroleum CompanyMar 8, 2002Mar 8, 2002—3,670
494728-98RecompletionShana Petroleum CompanyJun 27, 2000May 5, 2000Jun 19, 20003,670
494728-99RecompletionShana Petroleum CompanyMay 4, 2000May 5, 2000—3,670
489570-99RecompletionShana Petroleum CompanyNov 16, 1999Nov 16, 1999Nov 21, 19994,000
30045-99RecompletionTexaco Inc.Aug 7, 1978Aug 7, 1978—7,700
3323-99RecompletionTexaco Inc.Jul 18, 1977Jul 18, 1977—7,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-78605————
—— G-4-177668————
—— O-4-10106————

Perforations

Perforated and open-hole intervals.

FromToType
3,0683,072Perforated
3,6993,704Perforated
4,0364,042Perforated
4,0604,064Perforated
6,2156,226Perforated
—6,506Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,55815550 S
10.751,55915200 S
4.56,7008.751,250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 19, 2000Jul 5, 2000—
00Jul 19, 2000——
00Feb 18, 2000Jan 20, 2000Yes
00Feb 3, 2000——
00Nov 4, 1997Oct 15, 1997—
00Jan 12, 1984Sep 28, 1978—
00Jan 12, 1984Sep 2, 1977—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000087493H-1 InjectionPlugged Jun 21, 20025002,0004,016–4,110

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35530407, documented in the API reference.