WELL · 42-355-30450 · DISTRICT 4

Chapman, J. O. #64

N

Nueces County  · Vertical

Chapman, J. O. #64 (API 42-355-30450) is a permitted well in Nueces County filed by Shana Petroleum Company; no completion report is on file yet.

The RRC has issued 7 drilling permits (amended once) between 1977 and 2001, permitted to 7,600 ft.

Its 3 leases have reported 8.87K barrels of oil and 23.6K mcf of gas since January 1993, last reporting in September 2002. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

Shana Petroleum Company

Dallas, TX · P-5 Y, filed May 3, 2002 · 208 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsNeg Operating LLCthrough Jun 2002
Latest permitShana Petroleum CompanySep 26, 2001
7,600
total depth, ft
8
permits on file
Sep 26, 2001
last permit issued
—
completed
8.87K
cumulative oil, bbl
23.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2002

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Chapman, J. O. G-4-177290Chapman Ranch (3500)Neg Operating LLC1017.9KMay 2000 – Sep 2002
Chapman, J. O. O-4-9665Chapman Ranch (O-18)Neg Operating LLC48.87K5.65KJan 1993 – Sep 2002
— G-4-130551——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Jul 1994
  2. 2Royal Production Company, Inc.Aug 1994 → May 1995
  3. 3Shana Petroleum CompanyMay 2000 → Feb 2002
  4. 4Neg Operating LLCJun 2002 → Jun 2002

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
513942-99RecompletionShana Petroleum CompanySep 26, 2001Sep 26, 2001—7,600
494714-98RecompletionShana Petroleum CompanyJun 5, 2000May 5, 2000May 16, 20003,880
494714-99RecompletionShana Petroleum CompanyMay 4, 2000May 5, 2000—3,880
357016-99RecompletionTexaco Producing Inc.Mar 14, 1989Mar 15, 1989—7,600
297576-99RecompletionTexaco Producing Inc.Feb 6, 1986Feb 7, 1986—7,600
263242-99RecompletionTexaco Inc.Dec 27, 1984Dec 31, 1984—7,600
70959-99RecompletionTexaco Inc.Jan 28, 1980Jan 28, 1980—7,600
9933-99RecompletionTexaco Inc.Oct 17, 1977Oct 17, 1977—7,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-130551————
—— G-4-177290————
—— O-4-9665————

Perforations

Perforated and open-hole intervals.

FromToType
3,0523,066Perforated
3,5523,555Perforated
4,0154,020Perforated
4,3804,384Perforated
4,4664,471Perforated
4,5484,552Perforated
4,63640Perforated
—6,494Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,55112.25575 S
9.6251,55113.75710 S
9.6251,551——
2.3752,953——
7.8755,7977.875815 S
4.56,9238.751,450 S
4.56,923—1,450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 24, 2000Jun 5, 2000Yes
00Jun 26, 2000——
00Jun 12, 1990May 7, 1990—
00Jun 2, 1990——
00Jun 20, 1989Apr 27, 1989Yes
00May 19, 1989——
00Apr 17, 1986Apr 4, 1986Yes
00Apr 13, 1986——
00Mar 29, 1985Feb 8, 1985—
00Mar 20, 1985Jan 29, 1985—
00Jan 12, 1984Apr 22, 1980—
00Jan 12, 1984Jan 13, 1978—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35530450, documented in the API reference.