WELL · 42-355-31332 · DISTRICT 4

Countiss H.D. #1

Plugged

Nueces County · Agua Dulce (5950 West) field  · Vertical

Countiss H.D. #1 (API 42-355-31332) is a plugged well in Nueces County, plugged March 8, 1985, last operated by Mueller Engineering Corp..

The RRC has issued one drilling permit, issued October 2, 1978, permitted to 7,500 ft.

It was permitted by Sovereign Exploration Company and has since transferred to Mueller Engineering Corp. on the wellbore schedule.

Completion filings report 2 formation tops, including Comstock, Sinton.

Operator of record

Mueller Engineering Corp.

Permitted by Sovereign Exploration Company; the EWA schedule now lists a different operator.

Corpus Chrsti, TX · P-5 Y, filed May 11, 2001 · 236 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMueller Engineering Corp.
Production reportsnone
Latest permitSovereign Exploration CompanyOct 2, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,500
total depth, ft
1
permits on file
Oct 2, 1978
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Mar 8, 1985

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
33769-99DrillSovereign Exploration CompanyOct 2, 1978Oct 2, 1978Oct 29, 19787,500

Formation tops

As filed on W-2/G-1. Subsea from 91 ft elevation.Download CSV →

FormationMD ftSubsea
Comstock4,800-4,709
Sinton5,100-5,009

Perforations

Perforated and open-hole intervals.

FromToType
5,1385,187Perforated
5,9505,956Perforated
5,9805,985Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,17212.25530 S
2.8756,1427.875685 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 28, 1984Aug 20, 1984—
00Sep 15, 1984Aug 20, 1984—
00Mar 7, 1984Dec 20, 1983—
00Jan 31, 1984Dec 20, 1983—
00Jan 12, 1984Feb 16, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35531332, documented in the API reference.