WELL · 42-355-31812 · DISTRICT 4
Thompson R. A. A #4
Nueces County · Flour Bluff (H-99) field · Vertical
Thompson R. A. A #4 (API 42-355-31812) is a plugged well in Nueces County, plugged January 25, 2023, last operated by Exxon Corp..
The RRC has issued 3 drilling permits between 1981 and 1985, permitted to 8,900 ft.
Operator of record
Houston, TX · P-5 Y, filed Jan 3, 2003 · 19,549 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Corp. |
| Production reports | none |
| Latest permit | Exxon Corp.Apr 9, 1985 |
- 8,900
- total depth, ft
- 3
- permits on file
- Apr 9, 1985
- last permit issued
- Oct 2, 1982
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 2, 1982
- Shut in
- —
- Plugged
- Jan 25, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Thompson, R. A. "A" O-4-10988 | Flour Bluff | Amerril Energy LLC | 1 | 0 | 0 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 271632-99 | Recompletion | Exxon Corp. | Mar 12, 1986 | Apr 9, 1985 | — | 8,464 |
| 164861-99 | Recompletion | Exxon Corp. | Jun 28, 1982 | Jun 28, 1982 | — | 8,464 |
| 131077-99 | Drill | Exxon Corp. | Aug 14, 1981 | Aug 14, 1981 | Jul 24, 1981 | 8,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-4-10988 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,662 | 4,671 | Perforated |
| 4,676 | 4,694 | Perforated |
| 4,744 | 4,920 | Perforated |
| 6,688 | 6,691 | Perforated |
| 6,688 | 6,700 | Perforated |
| 8,166 | 8,170 | Perforated |
| 8,458 | 8,462 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,539 | 12.25 | 590 S |
| 2.875 | 8,331 | — | — |
| 5.5 | 8,479 | 8.75 | 890 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 12, 2002 | Sep 11, 2002 | — |
| 00 | Dec 12, 2001 | Nov 1, 2001 | — |
| 00 | Jun 29, 1989 | May 25, 1989 | — |
| 00 | Mar 25, 1986 | Mar 13, 1986 | Yes |
| 00 | Mar 21, 1986 | — | — |
| 00 | Jan 12, 1984 | Oct 14, 1982 | — |
| 00 | Jan 12, 1984 | Oct 23, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-355-31812 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-355-31812 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 5.03M
- bbl, all reported
- Feb 2016
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000068129 | W-14 Disposal | Plugged Feb 28, 2023 | 5,000 | 2,200 | 4,426–4,920 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35531812, documented in the API reference.