WELL · 42-355-32040 · DISTRICT 4
Doughty #3
Nueces County · Vertical
Doughty #3 (API 42-355-32040) is a permitted well in Nueces County filed by Sabine Corporation; no completion report is on file yet.
The RRC has issued 5 drilling permits between 1982 and 1987, permitted to 10,050 ft.
Completion filings report 3 formation tops, including Jansky, 9200' Sand, Frio.
Its lease has reported 2.33K barrels of oil and 9 mcf of gas since January 1993, last reporting in November 2011.
Operator of record
Dallas, TX · P-5 Y, filed Sep 15, 1989 · 88 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Magnum Producing & Operating Co.through Nov 1997 |
| Latest permit | Sabine CorporationNov 12, 1987 |
- 10,050
- total depth, ft
- 5
- permits on file
- Nov 12, 1987
- last permit issued
- —
- completed
- 2.33K
- cumulative oil, bbl
- 9
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Doughty O-4-11363 | Doughty (9220) | Magnum Producing, LP | 1 | 2.33K | 9 | Jan 1993 – Nov 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Magnum Producing & Operating Co.Jan 1993 → Nov 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 338555-99 | Recompletion | Sabine Corporation | Nov 9, 1987 | Nov 12, 1987 | — | 10,050 |
| 248559-99 | Recompletion | Sabine Corporation | Jul 26, 1984 | Jul 30, 1984 | — | 10,050 |
| 216187-99 | Recompletion | Sabine Production Company | Sep 29, 1983 | Oct 4, 1983 | — | 10,050 |
| 199508-99 | Other | Sabine Production Company | Jun 17, 1983 | Jun 17, 1983 | — | 10,000 |
| 166264-99 | Drill | Sabine Production Company | Jul 14, 1982 | Jul 14, 1982 | — | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-4-11363 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 38 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,464 | 7,470 | Perforated |
| 9,204 | 9,208 | Perforated |
| 9,855 | 9,862 | Perforated |
| 9,878 | 9,884 | Perforated |
| 9,903 | 9,907 | Perforated |
| 9,911 | 9,913 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,425 | 12.25 | 650 S |
| 2.375 | 9,801 | — | — |
| 4.5 | 10,040 | 7.125 | 692 S |
| 4.5 | 10,040 | 7.875 | 692 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 20, 1988 | Dec 1, 1987 | Yes |
| 00 | Apr 9, 1988 | — | — |
| 00 | Dec 18, 1984 | Oct 22, 1984 | — |
| 00 | Nov 9, 1984 | — | — |
| 00 | Jan 12, 1984 | Nov 5, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-355-32040 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-355-32040 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35532040, documented in the API reference.