WELL · 42-355-32466 · DISTRICT 4
Guaranty Title & Trust #1
Nueces County · Vertical
Guaranty Title & Trust #1 (API 42-355-32466) is a permitted well in Nueces County filed by Royal Production Company, Inc.; no completion report is on file yet.
The RRC has issued 6 drilling permits (amended once) between 1985 and 1999, permitted to 9,600 ft.
Completion filings report 4 formation tops, including K-5 Sand, L-1 Sand, L-2 Sand, L-3 Sand.
Operator of record
Royal Production Company, Inc.
Corpus Christ, TX · P-5 Y, filed Dec 4, 2025 · 235 permits on file · (361) 888-4792
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | EL Paso E & P Company, L. P.through Jan 2011 |
| Latest permit | Royal Production Company, Inc.Apr 30, 1999 |
- 9,600
- total depth, ft
- 7
- permits on file
- Apr 30, 1999
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 401K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Guaranty Title & Trust G-4-132463 | Saxet, Deep (7400) | Pine Island Operating, L.L.C. | 1 | 0 | 401K | Jan 1993 – Jul 2026 |
| — O-4-11681 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bell, Kelly Inc.Jan 1993 → Sep 1995
- 2Royal Production Company, Inc.Oct 1995 → Apr 2003
- 3Peoples Energy Prod.-TX, L.P.May 2003 → Sep 2007
- 4Coronado Energy E&P Company, LLCOct 2007 → Dec 2010
- 5EL Paso E & P Company, L. P.Jan 2011 → Jan 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 484014-99 | Recompletion | Royal Production Company, Inc. | Apr 21, 1999 | Apr 30, 1999 | — | 9,600 |
| 366287-99 | Recompletion | Bell, Kelly | Sep 22, 1989 | Sep 22, 1989 | — | 8,570 |
| 361047-98 | Recompletion | Bell, Kelly | Sep 5, 1989 | Jul 6, 1989 | — | 8,570 |
| 361047-99 | Recompletion | Bell, Kelly | Jul 3, 1989 | Jul 6, 1989 | — | 8,570 |
| 346306-99 | Recompletion | Bell, Kelly | May 9, 1988 | May 10, 1988 | — | 8,570 |
| 325828-99 | Recompletion | Bell, Kelly | Jan 26, 1987 | Jan 28, 1987 | — | 8,570 |
| 287498-99 | Drill | Bell, Kelly | Oct 4, 1985 | Oct 15, 1985 | Oct 20, 1985 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-132463 | — | — | — | — |
| — | — O-4-11681 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 48 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| K-5 Sand | 7,634 | -7,586 |
| L-1 Sand | 7,860 | -7,812 |
| L-2 Sand | 7,890 | -7,842 |
| L-3 Sand | 8,040 | -7,992 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,547 | 7,555 | Perforated |
| 7,634 | 7,637 | Perforated |
| 7,860 | 7,863 | Perforated |
| 8,040 | 8,044 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,512 | 12.25 | 396 S |
| 4.5 | 8,424 | 7.5 | 525 S |
| 4.5 | 8,424 | 8.5 | 525 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 30, 1989 | — | — |
| 00 | Nov 21, 1989 | Jul 21, 1989 | Yes |
| 00 | Oct 18, 1989 | — | — |
| 00 | Mar 21, 1989 | Nov 30, 1988 | Yes |
| 00 | Feb 1, 1989 | — | — |
| 00 | Oct 25, 1988 | May 19, 1988 | Yes |
| 00 | Aug 13, 1988 | — | — |
| 00 | Feb 25, 1987 | Feb 2, 1987 | Yes |
| 00 | Feb 13, 1987 | — | — |
| 00 | Jan 17, 1986 | Dec 17, 1985 | Yes |
| 00 | Jan 15, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-355-32466 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-355-32466 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35532466, documented in the API reference.