WELL · 42-355-32851 · DISTRICT 4

Lemond Unit Number One #1

Plugged

Nueces County · Agua Dulce (Lamb A) field  · Vertical

Lemond Unit Number One #1 (API 42-355-32851) is a plugged well in Nueces County, plugged September 9, 2024, last operated by S & D Vacuum Service LLC.

The RRC has issued one drilling permit (amended once), issued October 17, 1991, permitted to 7,200 ft.

It was permitted by Sinclair Exp CO & Erwin Eng Corp and has since transferred to S & D Vacuum Service LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Greta, Sinton, Frio.

Its lease has reported 4.59K barrels of oil and 268 mcf of gas since January 1993, last reporting in July 2026.

Operator of record

S & D Vacuum Service LLC

Permitted by Sinclair Exp Co & Erwin Eng Corp; the EWA schedule now lists a different operator.

Corpus Christ, TX · P-5 Y, filed Dec 4, 2025 · 1 permits on file · (361) 947-8884

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleS & D Vacuum Service LLC
Production reportsStarco Exploration, Inc.through Jun 2001
Latest permitSinclair Exp Co & Erwin Eng CorpOct 17, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,200
total depth, ft
2
permits on file
Oct 17, 1991
last permit issued
Nov 7, 1991
completed
4.59K
cumulative oil, bbl
268
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 7, 1991
Shut in
—
Plugged
Sep 9, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lemond Unit Number One O-4-11993Agua Dulce (Lamb A)S & D Vacuum Service, LLC14.59K268Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Barrett Brothers Oil and GasJan 1993 → Jan 1993
  2. 2Starco Exploration, Inc.Feb 1997 → Jun 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
392943-98DrillSinclair Exp Co & Erwin Eng CorpNov 12, 1991Oct 17, 1991Oct 18, 19916,861
392943-99DrillSinclair Exp Co & Erwin Eng CorpOct 16, 1991Oct 17, 1991—7,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-4-11993————

Formation tops

As filed on W-2/G-1. Subsea from 88 ft elevation.Download CSV →

FormationMD ftSubsea
Greta4,102-4,014
Sinton5,114-5,026
FrioBASAL FRIO6,628-6,540

Perforations

Perforated and open-hole intervals.

FromToType
6,6746,691Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62595212.25285 S
4.56,8617.875635 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 17, 1991Nov 15, 1991Yes
00Dec 4, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000099380H-1 InjectionPlugged Feb 20, 202510,0001,3002,600–4,400

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35532851, documented in the API reference.