WELL · 42-355-33237 · DISTRICT 4
Charba #2
Nueces County · Minnie Bock West (7190 Sand) field · Shut IN · Vertical
Charba #2 (API 42-355-33237) is a well in Nueces County operated by Alegre Operating Inc., completed September 20, 2000 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued July 14, 2000, permitted to 8,100 ft.
It was permitted by Rincon Petroleum Corporation and has since transferred to Alegre Operating Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Catahoula, Sinton, Vicksburg.
Its lease has reported 31.5K barrels of oil and 110K mcf of gas since September 2000, last reporting in July 2026.
Operator of record
Permitted by Rincon Petroleum Corporation; the EWA schedule now lists a different operator.
Corpus Chrsti, TX · P-5 Y, filed Apr 4, 2026 · (361) 877-8000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Alegre Operating Inc. |
| Production reports | Daylight Petroleum LLCthrough Aug 2020 |
| Latest permit | Rincon Petroleum CorporationJul 14, 2000 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,100
- total depth, ft
- 1
- permits on file
- Jul 14, 2000
- last permit issued
- Sep 20, 2000
- completed
- 31.5K
- cumulative oil, bbl
- 110K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2000 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 20, 2000
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Charba O-4-12975 | Minnie Bock, West (7190 Sand) | Alegre Operating, Inc. | 1 | 31.5K | 110K | Sep 2000 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rincon Petroleum CorporationSep 2000 → Nov 2007
- 2Sue-Ann Operating, L.C.Jan 2008 → Dec 2014
- 3Pintail Oil & Gas, LLCJan 2015 → Dec 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 496871-99 | Drill | Rincon Petroleum Corporation | Jul 5, 2000 | Jul 14, 2000 | Jul 22, 2000 | 8,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-4-12975 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 72 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,197 | 7,210 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,064 | 12.25 | 470 S |
| 4.5 | 8,085 | 7.875 | 506 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 9, 2001 | Oct 4, 2000 | Yes |
| 00 | Dec 29, 2000 | — | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-355-33237 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-355-33237 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35533237, documented in the API reference.