WELL · 42-355-33457 · DISTRICT 4
Davis #1
Nueces County · Block 885-S (5A Sand) field · Temp Abandoned · Vertical
Davis #1 (API 42-355-33457) is a well in Nueces County operated by TR Offshore LLC, completed August 10, 2002 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued May 13, 2002, permitted to 3,500 ft.
It was permitted by Davis Gulf Coast, Inc. and has since transferred to TR Offshore LLC on the wellbore schedule.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit.
Operator of record
Permitted by Davis Gulf Coast, Inc.; the EWA schedule now lists a different operator.
Corpus Christ, TX · P-5 Y, filed Nov 4, 2025 · (405) 708-4768
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | TR Offshore LLC |
| Production reports | none |
| Latest permit | Davis Gulf Coast, Inc.May 13, 2002 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,500
- total depth, ft
- 1
- permits on file
- May 13, 2002
- last permit issued
- Aug 10, 2002
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2004 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 10, 2002
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Davis G-4-203205 | Block 885-S (5A Sand) | TR Offshore, LLC | 1 | 0 | 0 | Aug 2004 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 519847-99 | Drill | Davis Gulf Coast, Inc. | May 9, 2002 | May 13, 2002 | Jul 10, 2002 | 3,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-203205 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,700 | 3,100 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 350 | 12.25 | 162 S |
| 5.5 | 3,200 | 8.5 | 611 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 29, 2004 | Aug 19, 2004 | Yes |
| 00 | Sep 9, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-355-33457 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-355-33457 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 618K
- bbl, all reported
- Mar 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000092403 | W-14 Disposal | Active | 1,500 | 1,350 | 2,700–3,100 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35533457, documented in the API reference.