WELL · 42-355-33534 · DISTRICT 4

TSL 33105/TR 53/ #8

Y

Nueces County · Encinal Channel (FB-B K-2 3) field · Temp Abandoned  · Vertical

Tsl 33105/TR 53/ #8 (API 42-355-33534) is a well in Nueces County operated by White Marlin Operating CO LLC, completed January 14, 2012 and listed as temp abandoned on the RRC schedule.

The RRC has issued 2 drilling permits (amended once) between 2003 and 2011, permitted to 11,000 ft.

It was permitted by Sabco Operating Company, LLC and has since transferred to White Marlin Operating CO LLC on the wellbore schedule.

Completion filings report one formation top, including Frio.

No lease production has been reported under this well’s leases.

Operator of record

White Marlin Operating Co LLC

Permitted by Sabco Operating Company, LLC; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Nov 4, 2025 · 32 permits on file · (713) 935-2325

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWhite Marlin Operating Co LLC
Production reportsWhite Marlin Operating Co, LLCthrough Jul 2017
Latest permitSabco Operating Company, LLCNov 14, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,000
total depth, ft
3
permits on file
Nov 14, 2011
last permit issued
Jan 14, 2012
completed
0
cumulative oil, bbl
4.17M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 14, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
TSL 33105/TR 53/ G-4-194843Encinal Channel (FB-1A, M-4)White Marlin Operating Co, LLC102.06MApr 2003 – Jul 2026
TSL 33105/TR 53/ G-4-266645Encinal Channel (FB-B, K-2,3)White Marlin Operating Co, LLC102.12MJan 2012 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sabco Operating CompanyApr 2003 → Oct 2011
  2. 2Sabco Operating Company, LLCJan 2012 → Jan 2014
  3. 3White Marlin Operating Co, LLCFeb 2014 → Jul 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
727709-99RecompletionSabco Operating Company, LLCNov 4, 2011Nov 14, 2011Jan 3, 201211,000
529529-98DrillSabco Operating CompanyMay 8, 2003Mar 13, 2003Mar 15, 200311,000
529529-99DrillSabco Operating CompanyMar 13, 2003Mar 13, 2003—11,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-194843————
—— G-4-266645————

Formation tops

As filed on W-2/G-1. Subsea from 34 ft elevation.Download CSV →

FormationMD ftSubsea
Frio6,400-6,366

Perforations

Perforated and open-hole intervals.

FromToType
8,8348,867Perforated
10,49410,498Perforated
10,50110,509Perforated
10,51810,586Perforated
10,54010,544Perforated
10,55210,555Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,01414.751,487 S
10.3752,01414.751,487 S
7.6259,3709.875670 S
510,6906.75205 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 20, 2013Jan 27, 2012—
00Jun 18, 2003Apr 30, 2003Yes
00Jun 11, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35533534, documented in the API reference.