WELL · 42-355-33536 · DISTRICT 4

TSL 33105/ TR 53 / #9

N

Nueces County  · Vertical

Tsl 33105/ TR 53 / #9 (API 42-355-33536) is a permitted well in Nueces County filed by White Marlin Operating CO, LLC; no completion report is on file yet.

The RRC has issued 5 drilling permits (amended once) between 2003 and 2014, permitted to 10,700 ft.

Completion filings report 5 formation tops, including Encinal Channel (Fb-B, K2,3), Fb-A, L4, 9415, M3.

Operator of record

White Marlin Operating Co, LLC

Houston, TX · P-5 Y, filed Nov 4, 2025 · 32 permits on file · (713) 935-2325

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsSabco Operating Company, LLCthrough Aug 2014
Latest permitWhite Marlin Operating Co, LLCOct 10, 2014
10,700
total depth, ft
6
permits on file
Oct 10, 2014
last permit issued
—
completed
0
cumulative oil, bbl
2.72M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
TSL 33105/TR 53/ G-4-195589Encinal Channel (FB-1A, M-4)White Marlin Operating Co, LLC102.71MMay 2003 – Jul 2026
TSL 33105/ TR 53/ G-4-273882Encinal Channel (FB-B, K-2,3)White Marlin Operating Co, LLC1018.6KDec 2013 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sabco Operating CompanyMay 2003 → Jan 2007
  2. 2Sabco Operating Company, LLCJan 2014 → Aug 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
797349-99RecompletionWhite Marlin Operating Co, LLCSep 30, 2014Oct 10, 2014—10,700
769604-99RecompletionSabco Operating Company, LLCSep 6, 2013Sep 16, 2013Oct 28, 201310,700
689581-99RecompletionSabco Operating CompanyJan 11, 2010Jan 27, 2010—10,700
622098-99RecompletionSabco Operating CompanyJul 6, 2006Jul 13, 2006—10,690
529933-98DrillSabco Operating CompanyJul 8, 2003Mar 25, 2003Apr 14, 200310,700
529933-99DrillSabco Operating CompanyMar 25, 2003Mar 25, 2003—10,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-195589————
—— G-4-273882————

Formation tops

As filed on W-2/G-1. Subsea from 2 ft elevation.Download CSV →

FormationMD ftSubsea
Encinal Channel (FB-B, K2,3)8,810-8,808
FB-A, L49,400-9,398
94159,415-9,413
94159,451-9,449
M310,248-10,246
M410,460-10,458

Perforations

Perforated and open-hole intervals.

FromToType
8,8438,894Perforated
9,4159,425Perforated
9,9699,987Perforated
10,24710,253Perforated
10,46010,480Perforated
10,48810,500Perforated
10,50710,528Perforated
10,53010,543Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,00014.751,410 S
7.6259,3159.875460 S
7.6259,3719.875545 S
510,6406.75240 S
510,6906.75314 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 4, 2016Mar 9, 2016—
00Mar 30, 2016Mar 9, 2016—
00Oct 10, 2014Jan 20, 2014—
00Oct 9, 2014Jan 17, 2014—
00Apr 25, 2007Oct 2, 2006—
00Jul 31, 2003Jun 16, 2003Yes
00Jul 24, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35533536, documented in the API reference.