WELL · 42-355-33590 · DISTRICT 4

St 49 Permanent Unit #8

Y

Nueces County · Encinal Channel (FB-a M-3) field · SWR-10-Well  · Vertical

ST 49 Permanent Unit #8 (API 42-355-33590) is a well in Nueces County operated by White Marlin Operating CO LLC, completed June 19, 2016 and listed as swr-10-well on the RRC schedule.

The RRC has issued 3 drilling permits between 2003 and 2016, permitted to 10,600 ft.

Completion filings report 3 formation tops, including Miocene (undifferentiated), Anahuac, Frio.

No lease production has been reported under this well’s leases.

Operator of record

White Marlin Operating Co LLC

Houston, TX · P-5 Y, filed Nov 4, 2025 · 32 permits on file · (713) 935-2325

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWhite Marlin Operating Co LLC
Production reportsWhite Marlin Operating Co, LLCthrough Oct 2019
Latest permitWhite Marlin Operating Co, LLCMar 11, 2016
10,600
total depth, ft
3
permits on file
Mar 11, 2016
last permit issued
Jun 19, 2016
completed
0
cumulative oil, bbl
5.68M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 19, 2016
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
TSL 33100/ TR 49/ G-4-200108Encinal Channel (FB-3B, M-4)White Marlin Operating Co, LLC105.02MDec 2003 – Jul 2026
St 49 Permanent Unit G-4-221667Encinal Channel (FB-a, M-2)White Marlin Operating Co, LLC10656KJun 2006 – Jul 2026
St 49 Permanent Unit G-4-280148Encinal Channel (FB-a, M-3)White Marlin Operating Co, LLC100Jun 2016 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sabco Operating CompanyJan 2004 → Oct 2011
  2. 2Sabco Operating Company, LLCNov 2011 → Jul 2013
  3. 3White Marlin Operating Co, LLCMar 2014 → Oct 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
814267-99RecompletionWhite Marlin Operating Co, LLCMar 8, 2016Mar 11, 2016Jun 16, 201610,600
618508-99RecompletionSabco Operating CompanyMay 1, 2006May 1, 2006Jun 20, 200610,600
538250-99DrillSabco Operating CompanyNov 5, 2003Nov 6, 2003Nov 23, 200310,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-200108————
—— G-4-221667————
—— G-4-280148————

Formation tops

As filed on W-2/G-1. Subsea from 33 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE1,000-967
Anahuac1,500-1,467
Frio8,000-7,967

Perforations

Perforated and open-hole intervals.

FromToType
9,9209,926Perforated
9,9209,956Perforated
9,9349,956Perforated
10,10610,134Perforated
10,43810,474Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,00014.75—
7.6259,3509.875—
510,6006.75—
510,6206.75185 S
510,6206.5—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 15, 2016Nov 7, 2016—
00Jun 23, 2016Jun 21, 2016—
00Mar 8, 2007Aug 14, 2006Yes
00Nov 16, 2006——
00Apr 26, 2004Feb 4, 2004Yes
00Mar 31, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35533590, documented in the API reference.