WELL · 42-355-33984 · DISTRICT 4
W.W. Walton #1
Nueces County · Vertical
W.W. Walton #1 (API 42-355-33984) is a permitted well in Nueces County filed by Republic Resources, LLC.; no completion report is on file yet.
The RRC has issued 3 drilling permits (amended once) between 2010 and 2012, permitted to 9,000 ft.
Completion filings report 4 formation tops, including Lagarto, Oakville, Anahuac, Frio.
Operator of record
Longview, TX · P-5 Y, filed Feb 4, 2026 · 133 permits on file · (361) 362-5246
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Republic Resources, LLC.through Jun 2013 |
| Latest permit | Republic Resources, LLC.Jun 4, 2012 |
- 9,000
- total depth, ft
- 4
- permits on file
- Jun 4, 2012
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 259K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2010 THROUGH Oct 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Walton, W. W. G-4-261019 | Doughty (Frio 7060) | Republic Resources, LLC. | 1 | 0 | 226K | Jan 2011 – Oct 2019 |
| Walton, W. W. G-4-257897 | Doughty (Frio 7250) | Republic Resources, LLC. | 1 | 0 | 32.5K | Jun 2010 – Nov 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Republic Resources, LLC.Oct 2010 → Jun 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 741374-99 | Recompletion | Republic Resources, LLC. | May 23, 2012 | Jun 4, 2012 | — | 9,000 |
| 714532-99 | Recompletion | Republic Resources, LLC. | Apr 19, 2011 | Apr 21, 2011 | Dec 9, 2010 | 9,000 |
| 693736-98 | Drill | Republic Resources, LLC. | Oct 1, 2010 | Apr 1, 2010 | May 28, 2010 | 9,000 |
| 693736-99 | Drill | Republic Resources, LLC. | Mar 30, 2010 | Apr 1, 2010 | — | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-257897 | — | — | — | — |
| — | — G-4-261019 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 44 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,926 | 6,930 | Perforated |
| 7,209 | 7,210 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,500 | 11 | 520 S |
| 4.5 | 8,466 | 7.875 | 745 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 11, 2011 | Apr 27, 2011 | — |
| 00 | Nov 19, 2010 | Nov 8, 2010 | — |
| 00 | Nov 18, 2010 | Oct 14, 2010 | Yes |
| 00 | Nov 8, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-355-33984 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-355-33984 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.