WELL · 42-357-30158 · DISTRICT 10

Pearson #1

N

Ochiltree County · Parsell South (Morrow Upper) field  · Vertical

Pearson #1 (API 42-357-30158) is a well in Ochiltree County operated by Jcb II Enterprises LLC, completed May 16, 1973.

The RRC has issued one drilling permit, issued October 24, 2003, permitted to 10,177 ft.

Completion filings report 5 formation tops, including Brown Dolomite, Cleveland, Novi, Morrow.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 143K barrels injected in the 12 months reported through March 2026.

Operator of record

JCB II Enterprises LLC

Perryton, TX · P-5 Y, filed Apr 4, 2025 · 10 permits on file · (806) 228-0138

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJCB II Enterprises LLC
Production reportsOverflow Energy, LLCthrough Nov 2008
Latest permitJCB II Enterprises, LLCOct 24, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,177
total depth, ft
1
permits on file
Oct 24, 2003
last permit issued
May 16, 1973
completed
0
cumulative oil, bbl
242K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 16, 1973
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
21 Mile SWD G-14-203143Pan Petro (Novi)Overflow Energy, LLC108.73KJan 2004 – Jul 2026
Pearson G-14-55820Parsell, South (Morrow Upper)JCB II Enterprises, LLC10120KJan 1993 – Jul 2005
Pearson G-14-55819Parnell, South (Morrow, Basal)JCB II Enterprises, LLC10114KJan 1993 – Dec 2003

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1TGX CorporationJan 1993 → Apr 1993
  2. 2Axis Energy CorporationMay 1993 → Dec 2001
  3. 3Occidental Energy Company, Inc.Jan 2002 → Jan 2002
  4. 4JCB II Enterprises, LLCJan 2004 → Apr 2008
  5. 5Overflow Energy, LLCMay 2008 → Nov 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
537889-99RecompletionJCB II Enterprises, LLCOct 24, 2003Oct 24, 2003Oct 24, 200310,177

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-55819————
—— G-14-55820————
—— G-14-203143————

Formation tops

As filed on W-2/G-1. Subsea from 2,996 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite3,570-574
Cleveland7,304-4,308
Novi8,646-5,650
MorrowMORROW SHALE8,836-5,840
MorrowUPPER MORROW SAND8,836-5,840
MorrowLOWER MORROW SAND9,994-6,998
Mississippian10,107-7,111

Perforations

Perforated and open-hole intervals.

FromToType
3,7144,240Perforated
8,6468,662Perforated
8,9388,960Perforated
9,99610,038Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,97012.251,750 S
8.6252,970—2,250 S
8.6252,990—2,250 S
4.53,4507.875100 S
4.53,4707.87550 S
4.54,3757.875100 S
4.510,1727.875950 S
4.510,177—950 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 27, 2010Jun 8, 2009—
00Oct 19, 2004Mar 4, 2004Yes
00Sep 8, 2004——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

143K
bbl, last 12 reported months
10.4M
bbl, all reported
Mar 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000100631W-14 DisposalActive10,0001,0003,420–4,250

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 142,619 · prior 12 117,904(+21%)

010K20K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35730158, documented in the API reference.