WELL · 42-357-30801 · DISTRICT 10

Greever #1

Plugged

Ochiltree County · Hansford (Morrow Upper) field  · Vertical

Greever #1 (API 42-357-30801) is a plugged well in Ochiltree County, plugged March 10, 2005, last operated by Chesapeake Operating Inc..

The RRC has issued 2 drilling permits (amended once) between 1977 and 1999, permitted to 7,950 ft.

It was permitted by Horizon Natural Gas Company and has since transferred to Chesapeake Operating Inc. on the wellbore schedule.

Completion filings report 4 formation tops, including Cleveland, Marmaton, Atoka, Morrow.

Operator of record

Chesapeake Operating Inc.

Permitted by Horizon Natural Gas Company; the EWA schedule now lists a different operator.

Oklahoma City, OK · P-5 Y, filed Jul 4, 2026 · 13,061 permits on file · (405) 935-7500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleChesapeake Operating Inc.
Production reportsHorizon Natural Gas Companythrough Jul 2001
Latest permitHorizon Natural Resources, Inc.Sep 10, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,950
total depth, ft
3
permits on file
Sep 10, 1999
last permit issued
Jan 1, 2001
completed
0
cumulative oil, bbl
42.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2005

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 1, 2001
Shut in
—
Plugged
Mar 10, 2005

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Greever G-14-75332Hansford (Morrow, Upper)Chesapeake Operating, Inc.1042.9KJan 1993 – Mar 2005

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Horizon Oil & Gas Co.Jan 1993 → Dec 1994
  2. 2Sonat Exploration Company-MCRJan 1995 → Oct 1996
  3. 3Horizon Natural Resources, Inc.Nov 1996 → Jul 1999
  4. 4Montgomery Petroleum, Inc.Aug 1999 → Jan 2000
  5. 5Mboe Oil and Gas LPFeb 2000 → Sep 2000
  6. 6Horizon Natural Gas CompanyOct 2000 → Jul 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
487476-98RecompletionHorizon Natural Gas CompanyDec 7, 2000Sep 10, 1999—7,950
487476-99RecompletionHorizon Natural Resources, Inc.Sep 10, 1999Sep 10, 1999—7,950
13892-99DrillHorizon Oil & Gas Co. of TexasDec 12, 1977Dec 12, 1977Dec 18, 19777,950

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-75332————

Formation tops

As filed on W-2/G-1. Subsea from 3,060 ft elevation.Download CSV →

FormationMD ftSubsea
Cleveland6,520-3,460
Marmaton6,770-3,710
Atoka7,462-4,402
Morrow7,700-4,640
MorrowUPPER MORROW7,815-4,755

Perforations

Perforated and open-hole intervals.

FromToType
7,4667,482Perforated
7,8197,829Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,52112.25900 S
8.6251,521—900 S
4.57,9447.875300 S
4.57,944—300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 23, 2005Feb 25, 2005—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35730801, documented in the API reference.