WELL · 42-357-30948 · DISTRICT 10
Graham #1
Ochiltree County · Vertical
Graham #1 (API 42-357-30948) is a plugged well in Ochiltree County, plugged November 18, 1979, last operated by Mcgee, Tom Corporation.
The RRC has issued 3 drilling permits between 1979 and 1990, permitted to 9,330 ft.
Completion filings report 3 formation tops, including Tonkawa, Cleveland, Atoka.
Its 2 leases have reported 41.6K barrels of oil and 550K mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Booker, TX · P-5 Y, filed Dec 10, 2021 · 35 permits on file · (806) 658-4591
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Highmark Energy Operating, LLCthrough Apr 2026 |
| Latest permit | McGee, Tom CorporationAug 20, 1990 |
- 9,330
- total depth, ft
- 3
- permits on file
- Aug 20, 1990
- last permit issued
- —
- completed
- 41.6K
- cumulative oil, bbl
- 550K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Nov 18, 1979
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Graham O-14-6757 | Peery (Cleveland) | Highmark Energy Operating, LLC | 1 | 41.6K | 550K | Jan 1993 – Jul 2026 |
| — G-14-101182 | — | — | 0 | 0 | 0 | — |
Gas, mcf lease total
Last 12 months 10,737 · prior 12 13,371(-20%)
Oil, barrels lease total
Last 12 months 561 · prior 12 757(-26%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1McGee, Tom CorporationJan 1993 → Dec 2003
- 2EOG Resources, Inc.Jan 2004 → Jan 2022
- 3Highmark Energy Operating, LLCFeb 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 376773-99 | Recompletion | McGee, Tom Corporation | Aug 20, 1990 | Aug 20, 1990 | — | 9,330 |
| 154871-99 | Other | McGee, Tom Corporation | Mar 22, 1982 | Mar 22, 1982 | — | 8,900 |
| 60903-99 | Drill | May Petroleum, Inc. | Oct 16, 1979 | Oct 16, 1979 | Oct 19, 1979 | 9,230 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-101182 | — | — | — | — |
| — | — O-14-6757 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,394 | 7,404 | Perforated |
| 7,411 | 7,415 | Perforated |
| 7,418 | 7,431 | Perforated |
| 7,444 | 7,459 | Perforated |
| 8,764 | 8,772 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,370 | 12.25 | — |
| 2.375 | 8,740 | — | — |
| 4.5 | 8,892 | 7.875 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 14, 1990 | Oct 17, 1990 | Yes |
| 00 | Nov 30, 1990 | — | — |
| 00 | Jan 12, 1984 | May 7, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-357-30948 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-357-30948 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35730948, documented in the API reference.