WELL · 42-357-31405 · DISTRICT 10

Dickinson, Charles P. et AL #2

N

Ochiltree County  · Vertical

Dickinson, Charles P. ET AL #2 (API 42-357-31405) is a permitted well in Ochiltree County filed by Apache Corporation; no completion report is on file yet.

The RRC has issued 4 drilling permits (amended once) between 1983 and 2011, permitted to 9,900 ft.

Completion filings report 11 formation tops, including Bd, Doug, Douglas, Kc.

Operator of record

Apache Corporation

Houston, TX · P-5 Y, filed Oct 4, 2025 · 9,754 permits on file · (713) 296-6400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsApache Corporationthrough Jul 2005
Latest permitApache CorporationJul 25, 2011
9,900
total depth, ft
5
permits on file
Jul 25, 2011
last permit issued
—
completed
0
cumulative oil, bbl
68.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Dickinson, Charles P. et AL G-14-268765Pan Petro (Cleveland)Apache Corporation100Mar 2013 – Jul 2013
Dickinson, Charles P. et AL G-14-157009Dutcher (Atoka)Apache Corporation1054.5KOct 1995 – Mar 2013
Dickinson, Charles P. et AL G-14-107662Parnell (Morrow-Gas Lower)Crescendo Resources, L.P.1014.1KJan 1993 – Dec 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Maxus Exploration CompanyJan 1993 → Jan 1995
  2. 2Midgard Energy CompanyFeb 1995 → Sep 1997
  3. 3Crescendo Resources, L.P.Oct 1997 → Oct 1999
  4. 4Apache CorporationDec 2000 → Jul 2005

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
720610-98RecompletionApache CorporationDec 20, 2011Jul 25, 2011Mar 15, 20139,040
720610-99RecompletionApache CorporationJul 20, 2011Jul 25, 2011—9,040
442638-99RecompletionMidgard Energy CompanyDec 8, 1995Dec 14, 1995Oct 17, 19959,040
201555-99DrillDiamond Chemicals CompanyJul 14, 1983Jul 14, 1983—9,900
196271-99DrillDiamond Chemicals CompanyMay 25, 1983May 25, 1983Jun 20, 19839,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-107662————
—— G-14-157009————
—— G-14-268765————

Formation tops

As filed on W-2/G-1. Subsea from 2,883 ft elevation.Download CSV →

FormationMD ftSubsea
BD3,493-610
Doug5,883-3,000
Douglas5,883-3,000
KC7,046-4,163
ClevelandCLEVELAND PAY7,244-4,361
Cleve Pay7,244-4,361
DM7,569-4,686
Atoka8,435-5,552
AtokaATOKA PAY8,482-5,599
13 FL8,545-5,662
MW8,652-5,769
MississippianMISS9,642-6,759

Perforations

Perforated and open-hole intervals.

FromToType
8,4788,492Perforated
9,2979,320Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,07412.251,550 S
2.3759,271——
5.59,5907.875325 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 19, 2013Jun 5, 2013—
00Mar 26, 1996Dec 7, 1995Yes
00Mar 4, 1996——
00Jan 12, 1984Sep 27, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35731405, documented in the API reference.