WELL · 42-357-31523 · DISTRICT 10

Doc #189

N

Ochiltree County · R. H. F. E. (Morrow Upper 8200) field  · Vertical

Doc #189 (API 42-357-31523) is a well in Ochiltree County operated by Natural Gas Anadarko Company, completed July 5, 1984.

The RRC has issued 2 drilling permits between 1984 and 2008, permitted to 8,700 ft.

Completion filings report 6 formation tops, including Dolomite, Douglas, Cleveland, Oswego.

Its 3 leases have reported 8.02K barrels of oil and 474K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Natural Gas Anadarko Company

Perryton, TX · P-5 Y, filed Dec 4, 2025 · 64 permits on file · (806) 435-2910

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNatural Gas Anadarko Company
Production reportsNatural Gas Anadarko Companythrough Apr 2026
Latest permitNatural Gas Anadarko CompanyAug 15, 2008
8,700
total depth, ft
2
permits on file
Aug 15, 2008
last permit issued
Jul 5, 1984
completed
8.02K
cumulative oil, bbl
474K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 5, 1984
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Doc O-14-8071Haywood (Atoka)Natural Gas Anadarko Company18.02K238KOct 2009 – Jul 2026
Doc G-14-113696R. H. F., E. (Morrow Upper 8200)Natural Gas Anadarko Company10236KJan 1993 – Mar 2010
Doc G-14-112378R. H. F., East (Morrow, Upper)Natural Gas Anadarko Company100Jan 1993 – Oct 2009

Gas, mcf lease total

Last 12 months 12,863 · prior 12 14,005(-8%)

05001K1.5K202420252026

Oil, barrels lease total

Last 12 months 457 · prior 12 780(-41%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Natural Gas Anadarko CompanyJan 1993 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
667805-99RecompletionNatural Gas Anadarko CompanyJul 29, 2008Aug 15, 2008Sep 10, 20098,700
231542-99DrillNatural Gas Anadarko, Inc.Jul 26, 1984Mar 6, 1984May 10, 19848,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-112378————
—— G-14-113696————
—— O-14-8071————

Formation tops

As filed on W-2/G-1. Subsea from 3,017 ft elevation.Download CSV →

FormationMD ftSubsea
Dolomite3,454-437
Douglas5,548-2,531
Cleveland6,836-3,819
Oswego7,208-4,191
Atoka7,867-4,850
MorrowMORROW SAND8,140-5,123
MorrowMORROW SHALE8,140-5,123

Perforations

Perforated and open-hole intervals.

FromToType
7,9487,976Perforated
8,2108,241Perforated
8,3948,403Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,67912.251,175 S
8.6251,67912.51,175 S
4.58,5507.875225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 29, 2010Nov 17, 2009Yes
00Jan 15, 2010——
00Dec 14, 1984Aug 1, 1984—
00Dec 4, 1984Jul 5, 1984—
00Nov 14, 1984Aug 1, 1984—
00Sep 20, 1984Jul 6, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35731523, documented in the API reference.