WELL · 42-357-31548 · DISTRICT 10

Kelly #1

Plugged

Ochiltree County · Pan Petro (Cleveland) field  · Vertical

Kelly #1 (API 42-357-31548) is a plugged well in Ochiltree County, plugged November 18, 2025, last operated by Bracken Operating L.L.C..

The RRC has issued 2 drilling permits between 1984 and 1997, permitted to 8,550 ft.

It was permitted by Kile Production and has since transferred to Bracken Operating L.L.C. on the wellbore schedule.

Completion filings report 11 formation tops, including Douglas, Kansas City, Cleveland, Marmaton.

Operator of record

Bracken Operating L.L.C.

Permitted by Kile Production; the EWA schedule now lists a different operator.

Perryton, TX · P-5 Y, filed Dec 4, 2025 · 140 permits on file · (806) 228-0138

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBracken Operating L.L.C.
Production reportsBracken Operating, L.L.C.through Oct 2022
Latest permitKile ProductionApr 15, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,550
total depth, ft
2
permits on file
Apr 15, 1997
last permit issued
Dec 27, 1996
completed
0
cumulative oil, bbl
243K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 27, 1996
Shut in
—
Plugged
Nov 18, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kelly G-14-123745Farnsworth, Se.(morrow, Up. Gas)Bracken Operating, L.L.C.107.93KJan 1993 – Jul 2026
Kelly G-14-164235R. H. F. (Cleveland)Bracken Operating, L.L.C.10235KDec 1996 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Kile ProductionFeb 1993 → Aug 2014
  2. 2Remnant Energy, Inc.Oct 2014 → Sep 2015
  3. 3Bracken Operating, L.L.C.Dec 2021 → Oct 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
460999-99RecompletionKile ProductionApr 11, 1997Apr 15, 1997Dec 27, 19967,210
236050-99DrillMote Resources, Inc.Apr 19, 1984Apr 19, 1984May 28, 19848,550

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-123745————
—— G-14-164235————

Formation tops

As filed on W-2/G-1. Subsea from 3,004 ft elevation.Download CSV →

FormationMD ftSubsea
Douglas5,672-2,668
DouglasDOUGLAS MARKER5,672-2,668
Kansas City6,862-3,858
Cleveland6,965-3,961
Marmaton7,290-4,286
Lower Novi8,096-5,092
Morrow8,326-5,322
Buckhaltz8,400-5,396
Pazourek Sand8,490-5,486
Pazourek Sd.8,490-5,486
White Sand8,552-5,548
White SD8,552-5,548

Perforations

Perforated and open-hole intervals.

FromToType
6,9776,982Perforated
6,9866,994Perforated
8,4928,502Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,22012.251,510 S
4.58,5708.5550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 10, 1997Feb 26, 1997Yes
00Sep 12, 1997——
00Jun 3, 1987Apr 3, 1987—
00May 19, 1987——
00Jul 11, 1984Jul 2, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35731548, documented in the API reference.