WELL · 42-357-31585 · DISTRICT 10

McGarraugh #1

N

Ochiltree County · McGarraugh W. (Morrow Up.) field  · Vertical

Mcgarraugh #1 (API 42-357-31585) is a well in Ochiltree County operated by Strat Land Exploration Company, completed January 9, 1985.

The RRC has issued 2 drilling permits between 1984 and 1993, permitted to 11,000 ft.

Completion filings report 10 formation tops, including Douglas, Cleveland, Oswego, Morrow.

Its 3 leases have reported 25.3K barrels of oil and 343K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Strat Land Exploration Company

Tulsa, OK · P-5 Y, filed Nov 4, 2022 · 607 permits on file · (806) 435-7292

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStrat Land Exploration Company
Production reportsStrat Land Exploration Companythrough Apr 2020
Latest permitStrat Land Exploration CompanyJan 5, 1993
11,000
total depth, ft
2
permits on file
Jan 5, 1993
last permit issued
Jan 9, 1985
completed
25.3K
cumulative oil, bbl
343K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 9, 1985
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McGarraugh O-14-8259Pan Petro (Cleveland)Mewbourne Oil Company12.54K51.2KMay 2011 – Jul 2026
McGarraugh O-14-6888Horizon (Cleveland)Strat Land Exploration Company122.8K292KJan 1993 – Nov 2011
McGarraugh O-14-5996McGarraugh, W. (Morrow Up.)Strat Land Exploration Company100Jan 1993 – Feb 2001

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Strat Land Exploration CompanyJan 1993 → Mar 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
406451-99RecompletionStrat Land Exploration CompanyNov 23, 1992Jan 5, 1993Dec 29, 19929,000
250637-99DrillMurexco Petroleum, Inc.Jul 23, 1984Sep 4, 1984Oct 4, 198411,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-5996————
—— O-14-6888————
—— O-14-8259————

Formation tops

As filed on W-2/G-1. Subsea from 2,960 ft elevation.Download CSV →

FormationMD ftSubsea
Douglas5,567-2,607
Cleveland6,870-3,910
Oswego7,323-4,363
Morrow8,276-5,316
St. Genevieve9,020-6,060
St. Louis9,108-6,148
Oswego9,323-6,363
Osage9,910-6,950
Hunton10,320-7,360
Viola10,530-7,570
Simpson10,855-7,895

Perforations

Perforated and open-hole intervals.

FromToType
6,4976,963Perforated
8,3748,384Perforated
9,1669,168Perforated
9,1829,186Perforated
9,3269,332Perforated
9,3469,350Perforated
9,3569,358Perforated
9,4689,470Perforated
9,4809,484Perforated
9,5009,502Perforated
9,5129,520Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62588712.251,050 S
8.62588712.51,050 S
5.57,0977.875715 S
5.58,340525 S
—10,139—490 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 3, 2011Jan 16, 2001—
00Mar 26, 2001Jan 16, 2001—
00May 3, 1993Mar 12, 1993Yes
00Mar 25, 1993——
00May 29, 1985May 13, 1985—
00Feb 20, 1985Jan 28, 1985—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35731585, documented in the API reference.