WELL · 42-357-31833 · DISTRICT 10

Waggoner Etta #1

Y

Ochiltree County · Flaherty (Morrow Upper) field · Producing  · Vertical

Waggoner Etta #1 (API 42-357-31833) is a well in Ochiltree County operated by Rig Petroleum LLC, completed October 29, 1986 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued August 13, 1986, permitted to 10,000 ft.

It was permitted by Princess Three Corporation and has since transferred to Rig Petroleum LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Pennsylvanian, Douglas, Tonkawa, Kansas City.

No lease production has been reported under this well’s leases.

Operator of record

Rig Petroleum LLC

Permitted by Princess Three Corporation; the EWA schedule now lists a different operator.

Spearman, TX · P-5 Y, filed Aug 4, 2025 · (806) 789-4263

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRig Petroleum LLC
Production reportsRig Petroleum, LLCthrough Mar 2026
Latest permitPrincess Three CorporationAug 13, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,000
total depth, ft
2
permits on file
Aug 13, 1986
last permit issued
Oct 29, 1986
completed
0
cumulative oil, bbl
198K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 29, 1986
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Waggoner, Etta G-14-124501Flaherty (Morrow Upper)Rig Petroleum, LLC10198KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 2,228 · prior 12 3,550(-37%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Princess Three CorporationJan 1993 → Dec 2004
  2. 2Princess Three Operating, LLCJan 2005 → Dec 2009
  3. 3Amarillo Exploration, Inc.Jan 2010 → Apr 2019
  4. 4Estes and CompanyMay 2019 → Jul 2020
  5. 5Estes and Company LLC.Aug 2020 → Aug 2025
  6. 6Rig Petroleum, LLCSep 2025 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
305214-98DrillPrincess Three CorporationJun 12, 1987Aug 13, 1986—10,000
305214-99DrillPrincess Three CorporationAug 14, 1986Aug 13, 1986Aug 18, 198610,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-124501————

Formation tops

As filed on W-2/G-1. Subsea from 2,856 ft elevation.Download CSV →

FormationMD ftSubsea
PennsylvanianPENNSYLVANIAN SHALE4,757-1,901
Douglas5,969-3,113
Tonkawa6,339-3,483
Kansas CityKANSAS CITY LIME7,170-4,314
ClevelandCLEVELAND SAND7,454-4,598
Morrow9,220-6,364

Perforations

Perforated and open-hole intervals.

FromToType
9,5069,520Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,66012.251,480 S
4.510,0167.875450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 13, 1987Apr 2, 1987Yes
00Jul 7, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35731833, documented in the API reference.