WELL · 42-357-31856 · DISTRICT 10
Kunkel Daniel E. #2
Ochiltree County · Pan Petro (Cleveland) field · Producing · Vertical
Kunkel Daniel E. #2 (API 42-357-31856) is a well in Ochiltree County operated by Latigo Petroleum LLC, completed March 10, 2004 and listed as producing on the RRC schedule.
The RRC has issued 3 drilling permits (amended twice) between 1986 and 2003, permitted to 9,454 ft.
It was permitted by BP America Production Company and has since transferred to Latigo Petroleum LLC on the wellbore schedule.
Completion filings report 13 formation tops, including Brown Dolomite, Squaw Belly, Douglas, Tonkawa.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by BP America Production Company; the EWA schedule now lists a different operator.
Pampa, TX · P-5 Y, filed May 4, 2026 · 76 permits on file · (432) 550-2320
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Latigo Petroleum LLC |
| Production reports | Latigo Petroleum, LLCthrough Mar 2026 |
| Latest permit | BP America Production CompanyFeb 18, 2003 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,454
- total depth, ft
- 5
- permits on file
- Feb 18, 2003
- last permit issued
- Mar 10, 2004
- completed
- 0
- cumulative oil, bbl
- 1.98M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 10, 2004
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kunkel, Daniel E. G-14-124048 | Hamker Ranch (Morrow, Basal) | Latigo Petroleum, LLC | 1 | 0 | 695K | Jan 1993 – Jul 2026 |
| Kunkel, Daniel E. G-14-183350 | Ellis Ranch (Atoka) | Latigo Petroleum, LLC | 1 | 0 | 143K | Nov 2000 – Jul 2026 |
| Kunkel, Daniel E. G-14-195395 | Pan Petro (Cleveland) | Latigo Petroleum, LLC | 1 | 0 | 1.14M | Apr 2003 – Jul 2026 |
Gas, mcf lease total
Last 12 months 27,381 · prior 12 28,691(-5%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Maxus Exploration CompanyJan 1993 → Jan 1995
- 2Midgard Energy CompanyFeb 1995 → Sep 1997
- 3Crescendo Resources, L.P.Oct 1997 → Mar 2000
- 4Amoco Production CompanyApr 2000 → Dec 2001
- 5BP America Production CompanyJan 2002 → Feb 2020
- 6Latigo Petroleum, LLCMar 2020 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 528345-99 | Recompletion | BP America Production Company | Feb 11, 2003 | Feb 18, 2003 | Apr 15, 2003 | 9,454 |
| 504022-98 | Recompletion | Amoco Production Company | Feb 12, 2001 | Jan 19, 2001 | Oct 27, 2000 | 9,450 |
| 504022-99 | Recompletion | Amoco Production Company | Jan 12, 2001 | Jan 19, 2001 | — | 8,300 |
| 324365-98 | Drill | Diamond Shamrock Exploration Co. | May 7, 1987 | Dec 16, 1986 | — | 9,450 |
| 324365-99 | Drill | Diamond Shamrock Exploration Co. | Dec 15, 1986 | Dec 16, 1986 | — | 9,450 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-124048 | — | — | — | — |
| — | — G-14-183350 | — | — | — | — |
| — | — G-14-195395 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,813 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 3,430 | -617 |
| Squaw Belly | 5,111 | -2,298 |
| Douglas | 5,763 | -2,950 |
| Tonkawa | 6,410 | -3,597 |
| Kansas City | 6,744 | -3,931 |
| T/Cleveland | 7,070 | -4,257 |
| Des Moines | 7,637 | -4,824 |
| Atoka | 8,300 | -5,487 |
| AtokaATOKA PAY | 8,353 | -5,540 |
| 13 Finger L | 8,427 | -5,614 |
| 13 Finger Lime | 8,427 | -5,614 |
| MorrowMORROW SHALE | 8,528 | -5,715 |
| Sqiaw Belly | 9,111 | -6,298 |
| Squaw Belly | 9,111 | -6,298 |
| MississippianMISS | 9,307 | -6,494 |
| MississippianMISS. | 9,307 | -6,494 |
| Mississippian | 9,307 | -6,494 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,072 | 7,092 | Perforated |
| 7,130 | 7,150 | Perforated |
| 8,352 | 8,366 | Perforated |
| 9,128 | 9,130 | Perforated |
| 9,142 | 9,252 | Perforated |
| 9,242 | 9,252 | Perforated |
| 9,279 | 9,284 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,010 | 12.25 | 1,275 S |
| 8.625 | 2,010 | 12.5 | 1,275 S |
| 5.5 | 9,450 | 7.875 | 600 S |
| 5.5 | 9,454 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 15, 2004 | Mar 26, 2004 | — |
| 00 | Jul 25, 2003 | May 16, 2003 | Yes |
| 00 | Jul 11, 2003 | — | — |
| 00 | Aug 30, 2001 | Jan 11, 2001 | Yes |
| 00 | Jul 31, 2001 | — | — |
| 00 | Jun 11, 1987 | May 8, 1987 | Yes |
| 00 | Jun 10, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-357-31856 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-357-31856 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35731856, documented in the API reference.