WELL · 42-357-31863 · DISTRICT 10

Parnell Brothers #8

Y

Ochiltree County · Parnell (Morrow Upper 9050) field · Producing  · Vertical

Parnell Brothers #8 (API 42-357-31863) is a well in Ochiltree County operated by Huntington Energy L.L.C., completed February 28, 2004 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits (amended once) between 1987 and 2004, permitted to 9,900 ft.

Completion filings report 6 formation tops, including Tonkawa, Cleveland, Morrow, Up. Morrow.

Its 2 leases have reported 15.9K barrels of oil and 489K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Huntington Energy L.L.C.

Nichols Hill, OK · P-5 Y, filed Feb 4, 2026 · 148 permits on file · (405) 840-9876

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHuntington Energy L.L.C.
Production reportsHuntington Energy, L.L.C.through Apr 2026
Latest permitHuntington Energy, L.L.C.Feb 10, 2004
9,900
total depth, ft
3
permits on file
Feb 10, 2004
last permit issued
Feb 28, 2004
completed
15.9K
cumulative oil, bbl
489K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 28, 2004
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Parnell Brothers G-14-125493Parnell (Morrow-Gas Lower)Huntington Energy, L.L.C.10122KJan 1993 – Jul 2026
Parnell Brothers O-14-7514Parnell (Morrow Upper 9050)Huntington Energy, L.L.C.115.9K367KFeb 2004 – Jul 2026

Gas, mcf lease total

Last 12 months 2,012 · prior 12 4,072(-51%)

0200400600202420252026

Oil, barrels lease total

Last 12 months 47 · prior 12 20(+135%)

0204060202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1American Exploration CompanyJan 1993 → Mar 1995
  2. 2Medallion Production CompanyApr 1995 → Aug 1996
  3. 3Intercoast Oil and Gas CompanySep 1996 → Mar 1997
  4. 4KCS Medallion Resources, Inc.Apr 1997 → Jun 1999
  5. 5Huntington Energy, L.L.C.Jul 1999 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
541540-99RecompletionHuntington Energy, L.L.C.Feb 2, 2004Feb 10, 2004Feb 15, 20049,900
329173-98DrillSun Exploration & Production Co.May 4, 1987Apr 21, 1987—9,900
329173-99DrillSun Exploration & Production Co.Apr 17, 1987Apr 21, 1987—9,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-125493————
—— O-14-7514————

Formation tops

As filed on W-2/G-1. Subsea from 2,940 ft elevation.Download CSV →

FormationMD ftSubsea
Tonkawa6,062-3,122
Cleveland7,063-4,123
Morrow8,470-5,530
Up. Morrow8,652-5,712
MorrowUPPER MORROW8,658-5,718
L. Morrow9,334-6,394
Mississippian9,415-6,475

Perforations

Perforated and open-hole intervals.

FromToType
8,6588,660Perforated
8,6718,678Perforated
9,3359,340Perforated
9,4429,475Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,80112.25875 S
5.59,6207.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 27, 2004Apr 14, 2004—
00Sep 21, 2004——
00Nov 19, 1987Oct 2, 1987Yes
00Nov 5, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35731863, documented in the API reference.