WELL · 42-357-31902 · DISTRICT 10
Barnett #1
Ochiltree County · Philcon-Maxwell (Morrow LO) field · Vertical
Barnett #1 (API 42-357-31902) is a well in Ochiltree County operated by Four Aces Company, completed July 1, 1988.
The RRC has issued 3 drilling permits between 1988 and 2000, permitted to 8,500 ft.
It was permitted by Kile Production and has since transferred to Four Aces Company on the wellbore schedule.
Completion filings report 3 formation tops, including Marmaton, L.Morrow, Morrow.
Its 3 leases have reported 12.3K barrels of oil and 243K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Kile Production; the EWA schedule now lists a different operator.
Borger, TX · P-5 Y, filed Dec 2, 1994 · 2 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Four Aces Company |
| Production reports | Remnant Energy, Inc.through Jul 2019 |
| Latest permit | Kile ProductionAug 14, 2000 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,500
- total depth, ft
- 3
- permits on file
- Aug 14, 2000
- last permit issued
- Jul 1, 1988
- completed
- 12.3K
- cumulative oil, bbl
- 243K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 1, 1988
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Barnett G-14-178166 | Philcon-Maxwell (Morrow, LO) | TC Oil and Gas, LLC | 1 | 0 | 236K | Jul 2000 – Jul 2026 |
| Barnett O-14-6867 | Allen-Parker (Marmaton) | Kile Production | 1 | 12.3K | 6.8K | Jan 1993 – Jan 2001 |
| — G-14-128155 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Four Aces CompanyJan 1993 → Mar 1995
- 2Kile ProductionMay 1995 → Aug 2014
- 3Remnant Energy, Inc.Sep 2014 → Jul 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 497874-99 | Recompletion | Kile Production | Jul 31, 2000 | Aug 14, 2000 | Jul 10, 2000 | 8,500 |
| 401674-99 | Recompletion | Four Aces Company | Jul 27, 1992 | Sep 9, 1992 | May 2, 1991 | 6,910 |
| 344476-99 | Drill | Four Aces Company | Mar 28, 1988 | Mar 29, 1988 | — | 8,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-128155 | — | — | — | — |
| — | — G-14-178166 | — | — | — | — |
| — | — O-14-6867 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,911 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,800 | 6,810 | Perforated |
| 6,832 | 6,884 | Perforated |
| 8,201 | 8,210 | Perforated |
| 8,201 | 8,254 | Perforated |
| 8,217 | 8,221 | Perforated |
| 8,235 | 8,244 | Perforated |
| 8,248 | 8,254 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,405 | 12.25 | 615 S |
| 4.5 | 8,375 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 29, 2000 | Jul 27, 2000 | — |
| 00 | Aug 28, 2000 | — | — |
| 00 | Nov 20, 1992 | Sep 16, 1992 | Yes |
| 00 | Sep 25, 1992 | — | — |
| 00 | Apr 30, 1992 | Mar 10, 1992 | — |
| 00 | Sep 12, 1988 | Aug 22, 1988 | Yes |
| 00 | Sep 1, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-357-31902 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-357-31902 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35731902, documented in the API reference.