WELL · 42-357-32082 · DISTRICT 10

Morris B #3

N

Ochiltree County · Ellis Ranch (Cleveland) field  · Vertical

Morris B #3 (API 42-357-32082) is a well in Ochiltree County operated by BP America Production Company, completed August 4, 2004.

The RRC has issued 2 drilling permits (amended once) between 1995 and 2004, permitted to 7,700 ft.

Completion filings report 7 formation tops, including Bd, Doug, Tonk, Kc.

Its 3 leases have reported 6.36K barrels of oil and 624K mcf of gas since April 1995, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

BP America Production Company

Denver, CO · P-5 Y, filed May 4, 2026 · 1,623 permits on file · (720) 439-5104

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBP America Production Company
Production reportsLatigo Petroleum, LLCthrough Mar 2026
Latest permitBP America Production CompanyMar 23, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,700
total depth, ft
3
permits on file
Mar 23, 2004
last permit issued
Aug 4, 2004
completed
6.36K
cumulative oil, bbl
624K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 1995 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 4, 2004
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Morris -B- G-14-154096Pan Petro (Cleveland)Latigo Petroleum, LLC10410KApr 1995 – Jul 2026
Morris "B" O-14-8396Pan Petro (Cleveland)Latigo Petroleum, LLC12.29K106KMay 2011 – Jul 2026
Morris "B" O-14-7542Ellis Ranch (Cleveland)BP America Production Company14.07K109KAug 2004 – Mar 2012

Gas, mcf lease total

Last 12 months 1,898 · prior 12 2,229(-15%)

0100200300202420252026

Oil, barrels lease total

Last 12 months 13 · prior 12 14(-7%)

012202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Midgard Energy CompanyApr 1995 → Sep 1997
  2. 2Crescendo Resources, L.P.Oct 1997 → Mar 2000
  3. 3Amoco Production CompanyApr 2000 → Dec 2001
  4. 4BP America Production CompanyJan 2002 → Feb 2020
  5. 5Latigo Petroleum, LLCMar 2020 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
543491-99DrillBP America Production CompanyMar 19, 2004Mar 23, 2004Jul 1, 20047,700
431743-98DrillMidgard Energy CompanyMay 18, 1995Feb 17, 1995—7,700
431743-99DrillMidgard Energy CompanyJan 11, 1995Feb 17, 1995May 13, 19957,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-154096————
—— O-14-7542————
—— O-14-8396————

Formation tops

As filed on W-2/G-1. Subsea from 2,739 ft elevation.Download CSV →

FormationMD ftSubsea
BD3,324-585
Doug5,788-3,049
Tonk6,426-3,687
KC6,768-4,029
Cleve Pay7,212-4,473
Hepler7,432-4,693
Cleve Pay7,512-4,773
DM7,528-4,789

Perforations

Perforated and open-hole intervals.

FromToType
7,1447,160Perforated
7,1447,256Perforated
7,2147,256Perforated
7,4707,484Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,79212.251,059 S
4.57,6907.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 14, 2012Sep 10, 2004—
00Mar 23, 2005Sep 10, 2004—
00Jan 13, 2005——
00Jun 19, 1995Apr 27, 1995Yes
00May 30, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35732082, documented in the API reference.