WELL · 42-357-32168 · DISTRICT 10
Sell, Julius #2
Ochiltree County · Vertical
Sell, Julius #2 (API 42-357-32168) is a permitted well in Ochiltree County filed by Midgard Energy Company; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1994 and 1996, permitted to 9,600 ft.
Completion filings report 13 formation tops, including Bd, Doug, Kc, Cleve Pay.
Operator of record
The Woodlands, TX · P-5 Y, filed Jul 2, 2004 · 357 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Latigo Petroleum, LLCthrough Mar 2026 |
| Latest permit | Midgard Energy CompanySep 5, 1996 |
- 9,600
- total depth, ft
- 2
- permits on file
- Sep 5, 1996
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 421K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 1996 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sell, Julius G-14-162225 | Pan Petro (Cleveland) | Latigo Petroleum, LLC | 1 | 0 | 421K | Nov 1996 – Jul 2026 |
Gas, mcf lease total
Last 12 months 788 · prior 12 457(+72%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Midgard Energy CompanyNov 1996 → Sep 1997
- 2Crescendo Resources, L.P.Oct 1997 → Mar 2000
- 3Amoco Production CompanyApr 2000 → Dec 2001
- 4BP America Production CompanyJan 2002 → Feb 2020
- 5Latigo Petroleum, LLCMar 2020 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 452200-99 | Drill | Midgard Energy Company | Sep 3, 1996 | Sep 5, 1996 | Oct 15, 1996 | 9,600 |
| 422673-99 | Drill | Maxus Exploration Company | Apr 4, 1994 | Apr 8, 1994 | — | 7,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-162225 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,796 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BD | 3,368 | -572 |
| Doug | 5,769 | -2,973 |
| KC | 6,720 | -3,924 |
| Cleve Pay | 7,202 | -4,406 |
| L/C MKR | 7,303 | -4,507 |
| Hepler | 7,368 | -4,572 |
| DM | 7,435 | -4,639 |
| Cherk | 7,909 | -5,113 |
| Atoka | 8,330 | -5,534 |
| A/P | 8,374 | -5,578 |
| 13F | 8,459 | -5,663 |
| MW | 8,578 | -5,782 |
| MississippianMISS | 9,493 | -6,697 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,204 | 7,273 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,195 | 12.25 | 1,495 S |
| 4.5 | 7,608 | 7.875 | 475 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 7, 1997 | Dec 27, 1996 | Yes |
| 00 | Apr 3, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-357-32168 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-357-32168 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35732168, documented in the API reference.