WELL · 42-357-32251 · DISTRICT 10

Tregellas W. T. #6757

N

Ochiltree County · Ellis Ranch (Cleveland) field  · Vertical

Tregellas W. T. #6757 (API 42-357-32251) is a well in Ochiltree County operated by BP America Production Company, completed March 16, 1999.

The RRC has issued one drilling permit, issued January 6, 1999, permitted to 9,500 ft.

It was permitted by Crescendo Resources, L.P. and has since transferred to BP America Production Company on the wellbore schedule.

Completion filings report 11 formation tops, including Bd, Dgls, Tonk, Kc.

Its 2 leases have reported 1.09K barrels of oil and 216K mcf of gas since March 1999, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

BP America Production Company

Permitted by Crescendo Resources, L.P.; the EWA schedule now lists a different operator.

Denver, CO · P-5 Y, filed May 4, 2026 · 1,623 permits on file · (720) 439-5104

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBP America Production Company
Production reportsLatigo Petroleum, LLCthrough Mar 2026
Latest permitCrescendo Resources, L.P.Jan 6, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,500
total depth, ft
1
permits on file
Jan 6, 1999
last permit issued
Mar 16, 1999
completed
1.09K
cumulative oil, bbl
216K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1999 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 16, 1999
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tregellas, W. T. G-14-188323Pan Petro (Cleveland)Latigo Petroleum, LLC10134KMar 2002 – Jul 2026
Tregellas, W. T. O-14-7313Ellis Ranch (Cleveland)BP America Production Company11.09K82.4KMar 1999 – Aug 2003

Gas, mcf lease total

Last 12 months 2,569 · prior 12 2,960(-13%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Crescendo Resources, L.P.Mar 1999 → Mar 2000
  2. 2Amoco Production CompanyApr 2000 → Oct 2001
  3. 3BP America Production CompanyFeb 2002 → Feb 2020
  4. 4Latigo Petroleum, LLCMar 2020 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
481877-99DrillCrescendo Resources, L.P.Jan 4, 1999Jan 6, 1999Feb 8, 19999,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-188323————
—— O-14-7313————

Formation tops

As filed on W-2/G-1. Subsea from 2,882 ft elevation.Download CSV →

FormationMD ftSubsea
BD3,480-598
Dgls5,826-2,944
Tonk6,450-3,568
KC6,760-3,878
Cleve Pay7,152-4,270
Hepler7,421-4,539
DM7,650-4,768
Atoka8,310-5,428
13 FGR8,425-5,543
Morrow8,530-5,648
Squaw Bly9,118-6,236

Perforations

Perforated and open-hole intervals.

FromToType
7,1587,193Perforated
7,2107,226Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,79812.25855 S
4.57,4987.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 11, 2002Apr 17, 2002—
00May 3, 2002——
00May 12, 1999Apr 30, 1999Yes
00May 5, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35732251, documented in the API reference.