WELL · 42-357-32618 · DISTRICT 10
Courson Ranch 148 #10
Ochiltree County · Vertical
Courson Ranch 148 #10 (API 42-357-32618) is a permitted well in Ochiltree County filed by Latigo Petroleum, Inc.; no completion report is on file yet.
The RRC has issued 2 drilling permits (amended 3 times) between 2006 and 2010, permitted to 10,500 ft.
Completion filings report 6 formation tops, including Douglas, Cleveland, Oswego, Morrow.
Operator of record
Houston, TX · P-5 Y, filed Sep 5, 2014 · 51 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Latigo Petroleum, LLCthrough Jul 2016 |
| Latest permit | Latigo Petroleum, Inc.May 14, 2010 |
- 10,500
- total depth, ft
- 5
- permits on file
- May 14, 2010
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 216K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2007 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Courson Ranch 148 G-14-228125 | Alpar-Lips (St. Louis) | Complete Oil & Gas Services, LLC | 1 | 0 | 216K | Jan 2007 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Latigo Petroleum Texas, LPJan 2007 → Feb 2009
- 2Latigo Petroleum, Inc.Mar 2009 → Jan 2011
- 3Plains Exploration & Prod. Co.Dec 2011 → Dec 2011
- 4Latigo Petroleum, LLCJul 2016 → Jul 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 695907-96 | Recompletion | Latigo Petroleum, Inc. | Aug 30, 2010 | May 14, 2010 | — | 7,600 |
| 695907-97 | Recompletion | Latigo Petroleum, Inc. | Aug 9, 2010 | May 14, 2010 | — | 8,950 |
| 695907-98 | Recompletion | Latigo Petroleum, Inc. | Aug 3, 2010 | May 14, 2010 | — | 10,500 |
| 695907-99 | Recompletion | Latigo Petroleum, Inc. | May 12, 2010 | May 14, 2010 | — | 10,500 |
| 626503-99 | Drill | Latigo Petroleum Texas, LP | Sep 25, 2006 | Sep 26, 2006 | Nov 10, 2006 | 9,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-228125 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,926 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,872 | 8,896 | Perforated |
| 8,930 | 8,936 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,628 | 12.25 | 915 S |
| 5.5 | 9,331 | 7.875 | 435 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 20, 2007 | Apr 2, 2007 | Yes |
| 00 | Jul 18, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-357-32618 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-357-32618 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/35732618, documented in the API reference.