WELL · 42-357-33006 · DISTRICT 10

Carrie 24 #5H

Y

Ochiltree County · Pan Petro (Cleveland) field · Producing  · Horizontal

Carrie 24 #5H (API 42-357-33006) is a horizontal well in Ochiltree County operated by Unbridled Resources LLC, completed June 26, 2011 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued April 26, 2011, permitted to 11,500 ft.

It was permitted by Latigo Petroleum, Inc. and has since transferred to Unbridled Resources LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Brown Dolomite, Kansas City, Cleveland.

Its lease has reported 108K barrels of oil and 390K mcf of gas since June 2011, last reporting in July 2026.

Operator of record

Unbridled Resources LLC

Permitted by Latigo Petroleum, Inc.; the EWA schedule now lists a different operator.

Oklahoma City, OK · P-5 Y, filed Sep 4, 2025 · 6 permits on file · (844) 507-5540

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUnbridled Resources LLC
Production reportsUnbridled Resources, LLCthrough Apr 2026
Latest permitLatigo Petroleum, Inc.Apr 26, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,500
total depth, ft
1
permits on file
Apr 26, 2011
last permit issued
Jun 26, 2011
completed
108K
cumulative oil, bbl
390K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 26, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Carrie 24 O-14-8457Pan Petro (Cleveland)Unbridled Resources, LLC1108K390KJun 2011 – Jul 2026

Gas, mcf lease total

Last 12 months 11,824 · prior 12 28,684(-59%)

05K10K202420252026

Oil, barrels lease total

Last 12 months 1,940 · prior 12 4,064(-52%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Plains Exploration & Prod. Co.Aug 2011 → Mar 2012
  2. 2Linn Operating, Inc.Apr 2012 → Dec 2014
  3. 3Enervest Operating, L.L.C.Jan 2015 → Dec 2015
  4. 44P Energy Texas, LLCJan 2016 → Oct 2020
  5. 5Unbridled Resources, LLCNov 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
714651-99DrillLatigo Petroleum, Inc.Apr 20, 2011Apr 26, 2011May 22, 201111,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-8457————

Formation tops

As filed on W-2/G-1. Subsea from 3,056 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite3,302-246
Kansas City6,635-3,579
Cleveland6,722-3,666

Perforations

Perforated and open-hole intervals.

FromToType
7,4037,403Perforated
7,6607,660Perforated
7,9177,917Perforated
8,1738,173Perforated
8,4308,430Perforated
8,6868,686Perforated
8,9408,940Perforated
9,1969,196Perforated
9,4509,450Perforated
9,7079,707Perforated
10,21710,217Perforated
10,46510,465Perforated
10,72510,725Perforated
10,98110,981Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,60712.25775 S
77,1618.75535 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 7, 2012Sep 9, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35733006, documented in the API reference.