WELL · 42-357-33317 · DISTRICT 10

Jack Russell 917 #3HM

Y

Ochiltree County · Kiowa Creek (Marmaton) field · Shut IN  · Horizontal

Jack Russell 917 #3HM (API 42-357-33317) is a horizontal well in Ochiltree County operated by Courson Oil & Gas Inc., completed February 21, 2014 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued September 20, 2013, permitted to 13,000 ft.

It was permitted by Midstates Petroleum Company LLC and has since transferred to Courson Oil & Gas Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Tonkawa, Cleveland, Marmaton.

Its lease has reported 192K barrels of oil and 2.38M mcf of gas since April 2012, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Courson Oil & Gas Inc.

Permitted by Midstates Petroleum Company LLC; the EWA schedule now lists a different operator.

Perryton, TX · P-5 Y, filed Dec 4, 2025 · 291 permits on file · (806) 435-2910

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCourson Oil & Gas Inc.
Production reportsCourson Oil & Gas, Inc.through Apr 2026
Latest permitMidstates Petroleum Company LLCSep 20, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
1
permits on file
Sep 20, 2013
last permit issued
Feb 21, 2014
completed
192K
cumulative oil, bbl
2.38M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 21, 2014
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jack Russell 917 O-14-8807Kiowa Creek (Marmaton)Courson Oil & Gas, Inc.3192K2.38MApr 2012 – Jul 2026

Gas, mcf lease total

Last 12 months 74,461 · prior 12 83,769(-11%)

05K10K202420252026

Oil, barrels lease total

Last 12 months 2,638 · prior 12 3,306(-20%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Holmes Exploration, LLCApr 2012 → May 2013
  2. 2Midstates Petroleum Company LLCJun 2013 → Aug 2014
  3. 3Courson Oil & Gas, Inc.Sep 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
770050-99DrillMidstates Petroleum Company LLCSep 16, 2013Sep 20, 2013Dec 15, 201313,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-8807————

Formation tops

As filed on W-2/G-1. Subsea from 2,883 ft elevation.Download CSV →

FormationMD ftSubsea
Tonkawa6,222-3,339
Cleveland6,820-3,937
Marmaton6,976-4,093

Perforations

Perforated and open-hole intervals.

FromToType
7,66310,388Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,15012.25900 S
77,1848.75180 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 15, 2016May 12, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35733317, documented in the API reference.