WELL · 42-357-33537 · DISTRICT 10

Texas Farms #1H

Y

Ochiltree County · Pan Petro (Cleveland) field · Producing  · Horizontal

Texas Farms #1H (API 42-357-33537) is a horizontal well in Ochiltree County operated by Mewbourne Oil Company, completed May 1, 2015 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued November 10, 2014, permitted to 13,000 ft.

It was permitted by Strat Land Exploration Company and has since transferred to Mewbourne Oil Company on the wellbore schedule.

Completion filings report 10 formation tops, including Brown Dolomite, Council Grove, Tonkawa, Chase Lower.

No lease production has been reported under this well’s leases.

Operator of record

Mewbourne Oil Company

Permitted by Strat Land Exploration Company; the EWA schedule now lists a different operator.

Tyler, TX · P-5 Y, filed May 4, 2026 · 2,059 permits on file · (903) 561-2900

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMewbourne Oil Company
Production reportsMewbourne Oil Companythrough Apr 2026
Latest permitStrat Land Exploration CompanyNov 10, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
2
permits on file
Nov 10, 2014
last permit issued
May 1, 2015
completed
0
cumulative oil, bbl
774K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2015 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 1, 2015
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Texas Farms G-14-279276Pan Petro (Cleveland)Mewbourne Oil Company10774KMay 2015 – Jul 2026

Gas, mcf lease total

Last 12 months 56,254 · prior 12 29,250(+92%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Strat Land Exploration CompanyMay 2015 → Sep 2022
  2. 2Mewbourne Oil CompanyOct 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
799943-98DrillStrat Land Exploration CompanyJul 8, 2015Nov 10, 2014Jan 7, 201513,000
799943-99DrillStrat Land Exploration CompanyNov 10, 2014Nov 10, 2014Jan 7, 201513,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-279276————

Formation tops

As filed on W-2/G-1. Subsea from 2,796 ft elevation.Download CSV →

FormationMD ftSubsea
Brown DolomiteBROWN DOLOMITE - PROD AND CORROS3,691-895
Council Grove3,870-1,074
Tonkawa5,450-2,654
Chase Lower6,000-3,204
Douglas6,245-3,449
Kansas CityKANSAS CITY LIME7,510-4,714
Cleveland7,797-5,001
Des MoinesDES MOINES - H2S CORROSIVE——
MarmatonMARMATON (DES MOINES)——
Oswego——

Perforations

Perforated and open-hole intervals.

FromToType
8,11012,597Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,00012.251,150 S
78,0128.75470 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 14, 2024Aug 2, 2024—
00Mar 3, 2016Jul 29, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35733537, documented in the API reference.