WELL · 42-359-30171 · DISTRICT 14

Aurora #12

Plugged

Oldham County  · Vertical

Aurora #12 (API 42-359-30171) is a plugged well in Oldham County, plugged June 9, 1982, last operated by Baker & Taylor Drilling CO..

The RRC has issued one drilling permit, issued May 20, 1982, permitted to 7,900 ft.

Operator of record

Baker & Taylor Drilling Co.

Amarillo, TX · P-5 Y, filed Oct 22, 1991 · 206 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitBaker & Taylor Drilling Co.May 20, 1982
7,900
total depth, ft
1
permits on file
May 20, 1982
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jun 9, 1982

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
162048-99DrillBaker & Taylor Drilling Co.May 20, 1982May 20, 1982—7,900

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Dec 2024
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000092443H-1 InjectionNot activated20,0003,6007,290–7,730

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120232024

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35930171, documented in the API reference.