WELL · 42-359-30330 · DISTRICT 10

NBR #1

Plugged

Oldham County · Paint Ridge (Canyon Granite WSH) field  · Vertical

Nbr #1 (API 42-359-30330) is a plugged well in Oldham County, plugged September 8, 2016, last operated by Arrow Oil & Gas LLC.

The RRC has issued one drilling permit (amended once), issued July 5, 2010, permitted to 10,000 ft.

Completion filings report 8 formation tops, including Cimmarron Anhydrite, Tubb, Red Cave, Brown Dolomite.

Its lease has reported 4.07K barrels of oil since August 2012, last reporting in October 2016.

Operator of record

Arrow Oil & Gas LLC

Norman, OK · P-5 Y, filed Jul 4, 2026 · 34 permits on file · (806) 677-8952

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleArrow Oil & Gas LLC
Production reportsArrow Oil & Gas, LLCthrough Aug 2015
Latest permitArrow Oil & Gas, LLCJul 5, 2010
10,000
total depth, ft
2
permits on file
Jul 5, 2010
last permit issued
Aug 1, 2012
completed
4.07K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2012 THROUGH Oct 2016

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 1, 2012
Shut in
—
Plugged
Sep 8, 2016

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
NBR O-14-8649Paint Ridge (Canyon Granite WSH)Arrow Oil & Gas, LLC14.07K0Aug 2012 – Oct 2016

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Arrow Oil & Gas, LLCAug 2012 → Aug 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
698359-98DrillArrow Oil & Gas, LLCFeb 22, 2013Jul 5, 2010May 8, 201210,000
698359-99DrillAog, Inc.Jun 30, 2010Jul 5, 2010May 8, 201210,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-8649————

Formation tops

As filed on W-2/G-1. Subsea from 3,262 ft elevation.Download CSV →

FormationMD ftSubsea
Cimmarron Anhydrite2,283979
Tubb2,630632
Red Cave2,930332
Brown Dolomite4,412-1,150
WolfcampWOLFCAMP SANDS5,510-2,248
WolfcampWOLFCAMP SHALE6,188-2,926
CiscoCISCO SHALE7,331-4,069
CiscoCISCO SAND7,458-4,196
Ert8,316-5,054
Washout Shale8,570-5,308

Perforations

Perforated and open-hole intervals.

FromToType
8,9328,942Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37549617.5610 S
9.6254,24612.25370 S
5.59,0548.75200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 27, 2013Aug 23, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/35930330, documented in the API reference.