WELL · 42-361-30621 · DISTRICT 3
Mil-Vid #3R
Orange County · Directional
Mil-Vid #3R (API 42-361-30621) is a permitted well in Orange County filed by Hilcorp Energy Company; no completion report is on file yet.
The RRC has issued 3 drilling permits (amended once) between 1990 and 2012, permitted to 17,000 ft.
Completion filings report 4 formation tops, including Frio, Hartburg, Vicksburg, Yegua.
Operator of record
Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Hilcorp Energy Companythrough Jan 2025 |
| Latest permit | Hilcorp Energy CompanyJun 21, 2012 |
- 17,000
- total depth, ft
- 4
- permits on file
- Jun 21, 2012
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 19.7M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mil-Vid G-3-271068 | Vidor Ames (Yegua DY) | Hilcorp Energy Company | 1 | 0 | 64.9K | Nov 2012 – Feb 2026 |
| Mil-Vid G-3-137789 | Vidor Ames (Yegua EY) | Hilcorp Energy Company | 1 | 0 | 19.6M | Jan 1993 – Nov 2012 |
Gas, mcf lease total
Last 12 months 0 · prior 12 228(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Amerada Hess CorporationJan 1993 → Jun 2006
- 2Hilcorp Energy CompanyJul 2006 → Jan 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 742728-99 | Recompletion | Hilcorp Energy Company | Jun 12, 2012 | Jun 21, 2012 | Sep 19, 2012 | 17,000 |
| 669303-99 | Recompletion | Hilcorp Energy Company | Aug 18, 2008 | Sep 23, 2008 | — | 17,000 |
| 379086-98 | Drill | Amerada Hess Corporation | Dec 13, 1990 | Oct 10, 1990 | Oct 14, 1990 | 17,000 |
| 379086-99 | Drill | Amerada Hess Corporation | Oct 8, 1990 | Oct 10, 1990 | — | 14,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-137789 | — | — | — | — |
| — | — G-3-271068 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 36 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 13,000 | 13,030 | Perforated |
| 13,356 | 13,428 | Perforated |
| 13,704 | 13,740 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 20 | 523 | 26 | 1,100 S |
| 13.375 | 5,590 | 17.5 | 3,910 S |
| 9.625 | 8,600 | 12.25 | 625 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 14, 2014 | Jan 2, 2013 | — |
| 00 | May 20, 1996 | Apr 3, 1996 | — |
| 00 | May 16, 1991 | Apr 15, 1991 | Yes |
| 00 | Apr 26, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-361-30621 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-361-30621 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36130621, documented in the API reference.