WELL · 42-361-30780 · DISTRICT 3
Donner #1
Orange County · Coon Bayou (Text Miss) field · Directional
Donner #1 (API 42-361-30780) is a plugged well in Orange County, plugged November 30, 2005, last operated by Lake Ronel Oil Company.
The RRC has issued one drilling permit (amended once), issued February 21, 2001, permitted to 10,500 ft.
Completion filings report 5 formation tops, including Marg Howei, Frio, Top Hackberry, Base Hackberry.
Its 2 leases have reported 4.05K barrels of oil and 369K mcf of gas since October 2002, last reporting in January 2006. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Tyler, TX · P-5 Y, filed Apr 3, 2020 · 73 permits on file · (903) 530-0511
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Lake Ronel Oil Company |
| Production reports | Lake Ronel Oil Companythrough Jun 2005 |
| Latest permit | Lake Ronel Oil CompanyFeb 21, 2001 |
- 10,500
- total depth, ft
- 2
- permits on file
- Feb 21, 2001
- last permit issued
- —
- completed
- 4.05K
- cumulative oil, bbl
- 369K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2002 THROUGH Jan 2006
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Nov 30, 2005
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Donner O-3-24462 | Coon Bayou (Text Miss) | Lake Ronel Oil Company | 1 | 4.05K | 103K | Dec 2003 – Jan 2006 |
| Donner G-3-192173 | Coon Bayou (Text Miss) | Lake Ronel Oil Company | 1 | 0 | 266K | Oct 2002 – Mar 2004 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Lake Ronel Oil CompanyOct 2002 → May 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 505601-98 | Drill | Lake Ronel Oil Company | Jun 21, 2002 | Feb 21, 2001 | Jul 31, 2002 | 10,500 |
| 505601-99 | Drill | Lake Ronel Oil Company | Feb 21, 2001 | Feb 21, 2001 | — | 10,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-192173 | — | — | — | — |
| — | — O-3-24462 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 10 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Marg Howei | 6,830 | -6,820 |
| FrioTOP FRIO | 6,933 | -6,923 |
| Top Hackberry | 8,572 | -8,562 |
| Base Hackberry | 9,530 | -9,520 |
| Top Tex Miss | 9,695 | -9,685 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,886 | 9,906 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,066 | 12.25 | 1,560 S |
| 9.625 | 8,710 | 9.875 | 610 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 2, 2004 | Dec 9, 2003 | — |
| 00 | Jan 7, 2004 | — | — |
| 00 | Feb 6, 2003 | Nov 19, 2002 | Yes |
| 00 | Jan 10, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-361-30780 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-361-30780 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36130780, documented in the API reference.