WELL · 42-361-30914 · DISTRICT 3

Port of Orange-Riverside #1

N

Orange County · Phoenix Lake (Hackberry 10 530) field  · Directional

Port Of Orange-Riverside #1 (API 42-361-30914) is a well in Orange County operated by Xto Energy Inc., completed August 30, 2011.

The RRC has issued 2 drilling permits (amended once) between 2011 and 2014, permitted to 10,800 ft.

Completion filings report 3 formation tops, including Miocene (undifferentiated), Frio, Hackberry.

Its 2 leases have reported 887K barrels of oil and 3.1M mcf of gas since August 2011, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

XTO Energy Inc.

Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,156 permits on file · (832) 625-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsOlipdp II, LLCthrough Apr 2026
Latest permitXTO Energy Inc.Jul 8, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,800
total depth, ft
3
permits on file
Jul 8, 2014
last permit issued
Aug 30, 2011
completed
887K
cumulative oil, bbl
3.1M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 30, 2011
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Port of Orange - Riverside O-3-26701South Phoenix Lake (Hackberry)Olipdp II, LLC1760K2.54MJul 2014 – Jul 2026
Port of Orange-Riverside O-3-25746Phoenix Lake (Hackberry 10,530)XTO Energy Inc.1127K561KAug 2011 – Jun 2015

Oil, barrels lease total

Last 12 months 9,911 · prior 12 10,745(-8%)

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 21,782 · prior 12 63,647(-66%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Aug 2011 → Feb 2017
  2. 2Five-Jab, Inc.Mar 2017 → Dec 2018
  3. 3Petrodome Operating, LLCJan 2019 → May 2022
  4. 4Olipdp II, LLCJun 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
788997-98RecompletionXTO Energy Inc.Sep 17, 2014Jul 8, 2014Jul 16, 201410,451
788997-99RecompletionXTO Energy Inc.Jun 9, 2014Jul 8, 2014—10,451
714283-99DrillLake Ronel Oil CompanyApr 14, 2011Apr 19, 2011May 27, 201110,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-25746————
—— O-3-26701————

Formation tops

As filed on W-2/G-1. Subsea from 11 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE7,215-7,204
Frio8,110-8,099
Hackberry9,264-9,253

Perforations

Perforated and open-hole intervals.

FromToType
10,35610,366Perforated
10,52610,536Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.753,20014.752,375 S
7.6259,5208.751,810 S
3.510,6416.75425 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 30, 2015Nov 3, 2014—
00Apr 23, 2012Sep 22, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36130914, documented in the API reference.