WELL · 42-361-30982 · DISTRICT 3
Moontower #1
Orange County · Hartburg S. (Lower Hackberry) field · Directional
Moontower #1 (API 42-361-30982) is a plugged well in Orange County, plugged November 20, 2019, last operated by Square Mile Energy L.L.C..
The RRC has issued one drilling permit, issued October 23, 2017, permitted to 8,650 ft.
Completion filings report 5 formation tops, including Miocene (undifferentiated), Frio, Hackberry - Disposal, Opiela Sand - Disposal.
Operator of record
Houston, TX · P-5 Y, filed Jun 4, 2026 · 177 permits on file · (866) 639-6618
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Square Mile Energy L.L.C. |
| Production reports | Square Mile Energy, L.L.C.through Oct 2019 |
| Latest permit | Square Mile Energy, L.L.C.Oct 23, 2017 |
- 8,650
- total depth, ft
- 1
- permits on file
- Oct 23, 2017
- last permit issued
- Jan 16, 2019
- completed
- 0
- cumulative oil, bbl
- 1.51M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2018 THROUGH Nov 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 16, 2019
- Shut in
- —
- Plugged
- Nov 20, 2019
Surface location
30.232038, -93.754213
OpenStreetMap → · Google Maps →
Permit surface location from the RRC GIS record, in Orange County.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Moontower G-3-284155 | Hartburg, S. (Lower Hackberry) | Square Mile Energy, L.L.C. | 1 | 0 | 1.51M | Jan 2018 – Nov 2019 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Square Mile Energy, L.L.C.Mar 2018 → Oct 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 831996-99 | Drill | Square Mile Energy, L.L.C. | Oct 13, 2017 | Oct 23, 2017 | Nov 30, 2017 | 8,650 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-284155 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 45 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE - DISPOSAL | 5,000 | -4,955 |
| FrioFRIO - DISPOSAL | 5,950 | -5,905 |
| Hackberry - Disposal | 7,825 | -7,780 |
| Opiela Sand - Disposal | — | — |
| YeguaYEGUA - DISPOSAL | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,936 | 7,950 | Perforated |
| 8,005 | 8,008 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,505 | 13.5 | 4,207 S |
| 7.625 | 7,616 | 9.875 | 800 S |
| 4.5 | 8,199 | 6.75 | 218 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 23, 2019 | Mar 5, 2019 | — |
| 00 | Jun 22, 2018 | Mar 9, 2018 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-361-30982 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-361-30982 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Nearby wells and their tops
NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM
Draw a cross-section
This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.
Claybar Unit42-351-30921
1.9 KM · Hilcorp Energy Company · Section with this well →
| Het - Disposal | 5,514 | -5,460 |
| Frio | 5,750 | -5,696 |
| Nodosaria - Disposal | 7,513 | -7,459 |
| Vicksburg | — | |
| Austin Chalk | — | |
| Miocene (undifferentiated) | — | |
| Wilcox | — |
HLR42-351-30928
2.0 KM · Cimarron Engineering, LLC · Section with this well →
| Miocene (undifferentiated) | 3,270 | -3,241 |
| Het - Disposal | 4,680 | -4,651 |
| Frio | 5,230 | -5,201 |
| Vicksburg | 5,740 | -5,711 |
| Nodosaria - Disposal | 7,820 | -7,791 |
| Wilcox | — | |
| Austin Chalk | — |
Emerald42-361-30992
2.3 KM · Cimarron Engineering, LLC · Section with this well →
| Miocene (undifferentiated) | 4,718 | -4,689 |
| Frio | 5,328 | -5,299 |
| Hackberry - Disposal | 5,827 | -5,798 |
| Opiela Sand - Disposal | 6,103 | -6,074 |
| Yegua | 6,521 | -6,492 |
Powell Lumber Company K42-361-30570
2.9 KM · IP Petroleum Company, Inc. · Section with this well →
| Frio | 7,185 | -7,164 |
| Hackberry | 8,532 | -8,511 |
| Hackberry - Disposal | 8,672 | -8,651 |
| Miocene (undifferentiated) | — | |
| Opiela Sand - Disposal | — | |
| Yegua | — |
Nicholas42-351-30831
4.5 KM · Samson Lone Star, LLC · Section with this well →
| Frio | 5,610 | -5,579 |
| Hackberry | 7,500 | -7,469 |
| Cockfield | 10,550 | -10,519 |
| Cockfied | 10,550 | -10,519 |
| Yegua | 11,336 | -11,305 |
Hinrichs42-351-30918
4.8 KM · Hilcorp Energy Company · Section with this well →
| Het - Disposal | 5,330 | -5,297 |
| Frio | 5,573 | -5,540 |
| Nodosaria - Disposal | 7,575 | -7,542 |
| Miocene (undifferentiated) | — | |
| Austin Chalk | — | |
| Wilcox | — | |
| Vicksburg | — |
Lost Creek42-361-30988
5.1 KM · Square Mile Energy, L.L.C. · Section with this well →
| Miocene (undifferentiated) | 4,962 | -4,916 |
| Frio | 5,882 | -5,836 |
| Hackberry - Disposal | 8,438 | -8,392 |
| Opiela Sand - Disposal | — | |
| Yegua | — |
Falcon42-351-30929
7.2 KM · Contour Expl and Prod, LLC · Section with this well →
| Nodosaria - Disposal | 7,433 | -7,400 |
| Het - Disposal | — | |
| Austin Chalk | — | |
| Frio | — | |
| Wilcox | — | |
| Vicksburg | — | |
| Miocene (undifferentiated) | — |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36130982, documented in the API reference.