WELL · 42-363-01940 · DISTRICT 7
Edmondson #5
Palo Pinto County · Brazos Bishop (Strawn 2100) field · Vertical
Edmondson #5 (API 42-363-01940) is a plugged well in Palo Pinto County, plugged October 19, 2023, last operated by Dallas Production Company LLC.
The RRC has issued one drilling permit, issued October 18, 2005, permitted to 5,000 ft.
It was permitted by Engas Corporation and has since transferred to Dallas Production Company LLC on the wellbore schedule.
Completion filings report one formation top, including Strawn.
Operator of record
Permitted by Engas Corporation; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Nov 4, 2025 · 28 permits on file · (405) 436-6429
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Dallas Production Company LLC |
| Production reports | Dallas Production, Inc.through Sep 2014 |
| Latest permit | Engas CorporationOct 18, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,000
- total depth, ft
- 1
- permits on file
- Oct 18, 2005
- last permit issued
- Apr 23, 2007
- completed
- 0
- cumulative oil, bbl
- 19.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2007 THROUGH Oct 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 23, 2007
- Shut in
- —
- Plugged
- Oct 19, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Edmondson G-8-227477 | Brazos Bishop (Strawn 2100) | Dallas Production Company LLC | 1 | 0 | 19.9K | Mar 2007 – Oct 2023 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Engas CorporationMar 2007 → Mar 2007
- 2Tempo Resources GP, LLCApr 2007 → Apr 2013
- 3Dallas Production, Inc.May 2013 → Sep 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 608064-99 | Reenter | Engas Corporation | Oct 18, 2005 | Oct 18, 2005 | — | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-227477 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,106 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Strawn | 2,170 | -1,064 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,321 | 2,333 | Perforated |
| 2,569 | 2,577 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 335 | 13 | 335 S |
| 4.5 | 3,053 | 9 | 450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 9, 2007 | May 17, 2007 | Yes |
| 00 | Jun 27, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-01940 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-01940 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36301940, documented in the API reference.