WELL · 42-363-30047 · DISTRICT 7

Seaman #3SW

Plugged

Palo Pinto County · Palo Pinto County Regular field  · Vertical

Seaman #3SW (API 42-363-30047) is a plugged well in Palo Pinto County, plugged September 26, 1997, last operated by P & M Construction.

The RRC has issued one drilling permit (amended once), issued June 2, 2006, permitted to 4,000 ft.

It was permitted by Kornye-Tillman Company and has since transferred to P & M Construction on the wellbore schedule.

Its 2 leases have reported 2.49K barrels of oil and 2.76K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

P & M Construction

Permitted by Kornye-Tillman Company; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Jul 6, 2012

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleP & M Construction
Production reportsP & M Constructionthrough Jul 1997
Latest permitKornye-Tillman CompanyJun 2, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
2
permits on file
Jun 2, 2006
last permit issued
Apr 11, 1970
completed
2.49K
cumulative oil, bbl
2.76K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 11, 1970
Shut in
—
Plugged
Sep 26, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Custard-Pitts O-8-29881Palo Pinto County RegularBlackbird R 22 OG L.L.C.100Feb 2007 – Jul 2026
Seaman O-8-11273Palo Pinto County RegularP & M Construction12.49K2.76KJan 1993 – Nov 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Wes-Mor Drilling, Inc.Jan 1993 → Feb 1993
  2. 2P & M ConstructionMar 1993 → Jul 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
619725-98ReenterKornye-Tillman CompanyJan 29, 2007Jun 2, 2006Feb 1, 20074,000
619725-99ReenterKornye-Tillman CompanyMay 22, 2006Jun 2, 2006—2,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-11273————
—— O-8-29881————

Perforations

Perforated and open-hole intervals.

FromToType
2,2302,260Perforated
2,3122,324Perforated
4,0634,071Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62523212.25175 S
4.52,6807.875640 S
4.54,1117.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 21, 2007Mar 19, 2007—
00Apr 9, 2007——
00Jan 12, 1984May 14, 1970—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
272K
bbl, all reported
May 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000096384W-14 DisposalActive1,0007201,440–2,600

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36330047, documented in the API reference.