WELL · 42-363-31159 · DISTRICT 7
Canty #1
Palo Pinto County · Belding (Bend Congl.) field · Vertical
Canty #1 (API 42-363-31159) is a plugged well in Palo Pinto County, plugged August 24, 2021, last operated by Mogul Resources LLC.
The RRC has issued one drilling permit, issued October 19, 1977, permitted to 4,060 ft.
It was permitted by Twin Montana, Inc. and has since transferred to Mogul Resources LLC on the wellbore schedule.
Operator of record
Permitted by Twin Montana, Inc.; the EWA schedule now lists a different operator.
Cisco, TX · P-5 Y, filed Mar 4, 2026 · (254) 631-1404
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mogul Resources LLC |
| Production reports | Mogul Resources, LLCthrough Mar 2021 |
| Latest permit | Twin Montana, Inc.Oct 19, 1977 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,060
- total depth, ft
- 1
- permits on file
- Oct 19, 1977
- last permit issued
- Aug 23, 1977
- completed
- 0
- cumulative oil, bbl
- 446K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2021
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 23, 1977
- Shut in
- —
- Plugged
- Aug 24, 2021
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Canty G-8-73029 | Belding (Bend Congl.) | Mogul Resources, LLC | 1 | 0 | 446K | Jan 1993 – Aug 2021 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Echo Production, Inc.Jan 1993 → Feb 2019
- 2Mogul Resources, LLCMar 2019 → Mar 2021
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 10177-99 | Drill | Twin Montana, Inc. | Oct 19, 1977 | Oct 19, 1977 | — | 4,060 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-73029 | — | — | — | — |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 154 | 12.25 | 110 S |
| 4.5 | 4,004 | 7.875 | 90 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Sep 26, 1977 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-31159 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-31159 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36331159, documented in the API reference.