WELL · 42-363-32739 · DISTRICT 7

Parish 36 #1

Plugged

Palo Pinto County · J. V. T. (Strawn 2400) field  · Vertical

Parish 36 #1 (API 42-363-32739) is a plugged well in Palo Pinto County, plugged September 10, 2001, last operated by Pardue Energy Inc..

The RRC has issued one drilling permit, issued September 10, 1981, permitted to 2,180 ft.

It was permitted by Diamond Chemicals Company and has since transferred to Pardue Energy Inc. on the wellbore schedule.

Operator of record

Pardue Energy Inc.

Permitted by Diamond Chemicals Company; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Nov 6, 2015 · 3 permits on file · (817) 735-9188

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePardue Energy Inc.
Production reportsPardue Energy Inc.through Sep 1998
Latest permitDiamond Chemicals CompanySep 10, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,180
total depth, ft
1
permits on file
Sep 10, 1981
last permit issued
Dec 1, 1981
completed
0
cumulative oil, bbl
13.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2001

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 1, 1981
Shut in
—
Plugged
Sep 10, 2001

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Parish 36 G-8-96654J. V. T. (Strawn 2400)Pardue Energy Inc.1013.6KJan 1993 – Sep 2001

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pardue, William M., IIIJan 1993 → Jan 1996
  2. 2Pardue Energy Inc.Feb 1997 → Sep 1998

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
132883-99DrillDiamond Chemicals CompanySep 10, 1981Sep 10, 1981Sep 14, 19812,180

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-96654————

Perforations

Perforated and open-hole intervals.

FromToType
1,9162,180Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62561212.25525 S
2.3751,812——
5.54,3127.875260 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Dec 21, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36332739, documented in the API reference.