WELL · 42-363-32815 · DISTRICT 7
Walter #1
Palo Pinto County · Vertical
Walter #1 (API 42-363-32815) is a permitted well in Palo Pinto County filed by Tracer Operating, Inc.; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1981 and 2010, permitted to 4,465 ft.
Completion filings report 2 formation tops, including Strawn, Marble Falls.
Operator of record
Graham, TX · P-5 Y, filed Jul 4, 2026 · 81 permits on file · (940) 549-4683
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Tracer Operating, Inc.through Apr 2026 |
| Latest permit | Tracer Operating, Inc.May 11, 2010 |
- 4,465
- total depth, ft
- 3
- permits on file
- May 11, 2010
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 467K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Walter G-8-255951 | Strawn, NW. (Marble Falls) | Tracer Operating, Inc. | 1 | 0 | 404K | Jan 2010 – Jul 2026 |
| Walter G-8-99960 | Palo Pinto, SW (Strawn) | Tracer Operating, Inc. | 1 | 0 | 63.4K | Jan 1993 – Sep 2010 |
Gas, mcf lease total
Last 12 months 12 · prior 12 618(-98%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Telesis Operating Co., Inc.Jan 1994 → Sep 1998
- 2Sitton, Ronnie IncorporatedOct 1998 → Jun 1999
- 3Bonzorella EnergyJul 1999 → Apr 2005
- 4Dry Fork Production Co., LLCMay 2005 → Jan 2008
- 5Tracer Operating, Inc.May 2009 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 692758-99 | Recompletion | Tracer Operating, Inc. | Mar 11, 2010 | May 11, 2010 | Jan 25, 2010 | 4,465 |
| 163487-99 | Drill | Way Oil Co.,the | Jun 3, 1982 | Jun 3, 1982 | — | 4,465 |
| 144369-99 | Drill | Way Oil Co.,the | Dec 16, 1981 | Dec 16, 1981 | — | 4,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-99960 | — | — | — | — |
| — | — G-8-255951 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,180 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Strawn | 3,100 | -1,920 |
| Marble Falls | 4,000 | -2,820 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,452 | 2,462 | Perforated |
| 3,880 | 4,060 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 236 | 11.5 | 180 S |
| 2.375 | 4,448 | — | — |
| 4.5 | 4,465 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 30, 2010 | Feb 16, 2010 | Yes |
| 00 | Jun 1, 2010 | — | — |
| 00 | Jan 12, 1984 | Apr 12, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-363-32815 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-363-32815 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36332815, documented in the API reference.