WELL · 42-363-32899 · DISTRICT 7

Green Florence #3

Plugged

Palo Pinto County · Palo Pinto County Regular field  · Vertical

Green Florence #3 (API 42-363-32899) is a plugged well in Palo Pinto County, plugged December 17, 2025, last operated by Rife M. O. JR..

The RRC has issued 2 drilling permits between 1982 and 1994, permitted to 3,200 ft.

Completion filings report 3 formation tops, including Shallow Strawn Sands, Lime Marker, Pennsylvanian.

Its 2 leases have reported 195 barrels of oil and 52.2K mcf of gas since January 1993, last reporting in December 2025. The leases carry 13 wells, so these are lease totals, not this well alone.

Operator of record

Rife M. O. Jr.

Fort Worth, TX · P-5 Y, filed Jul 2, 1999 · 289 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRife M. O. Jr.
Production reportsRBR Production, LLCthrough Nov 2025
Latest permitRife, M. O., Jr.Feb 28, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,200
total depth, ft
2
permits on file
Feb 28, 1994
last permit issued
Sep 29, 1982
completed
195
cumulative oil, bbl
52.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2025

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 29, 1982
Shut in
—
Plugged
Dec 17, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 13 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Green, Florence G-8-148844Boggy Bottom (Strawn)RBR Production, LLC1052.2KMar 1994 – Dec 2025
Green, Florence O-8-19040Palo Pinto County RegularRife, M. O., Jr.121954Jan 1993 – May 1996

Gas, mcf lease total

Last 12 months 234 · prior 12 493(-53%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Rife, M. O., Jr.Jan 1993 → Dec 1998
  2. 2Rife Operating, Ltd.Jan 1999 → Sep 2005
  3. 3Burlington Resources O & G Co LPOct 2005 → Nov 2005
  4. 4PK Gath & Oilfield Svcs, Inc.Mar 2020 → Sep 2020
  5. 5Rocker B Production, L.L.C.Oct 2023 → Aug 2025
  6. 6RBR Production, LLCSep 2025 → Nov 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
421452-99RecompletionRife, M. O., Jr.Feb 24, 1994Feb 28, 1994Mar 9, 19943,200
158065-99DrillRife, M. O., Jr.Apr 26, 1982Apr 26, 1982—3,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-148844————
—— O-8-19040————

Formation tops

As filed on W-2/G-1. Subsea from 961 ft elevation.Download CSV →

FormationMD ftSubsea
Shallow Strawn Sands1,325-364
Lime Marker2,116-1,155
PennsylvanianPENNSYLVANIAN STRAWN2,359-1,398

Perforations

Perforated and open-hole intervals.

FromToType
1,3251,485Perforated
2,4402,452Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62520312.25190 S
2.3751,330——
4.51,4507.875100 S
2.8752,4914.540 S
4.53,2207.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 9, 1994Apr 19, 1994Yes
00Apr 28, 1994——
00Jan 12, 1984Oct 13, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36332899, documented in the API reference.